Traffic Engineering. Detailed Traffic Control Plans (TCP) will be prepared based on the approach and the number of construction phases decided in the conceptual TCP as part of the study. TCP will be designed according to the latest edition of The Texas Manual on Uniform Traffic Control Devices. Standard TxDOT details will be used as available/applicable. Storm water pollution prevention plans (SWPPP) will be prepared and included in the construction documents and project manual based on FBC criteria. The goal is to prepare construction drawings and specifications accurately and efficiently. CobbFendley will deliver 70 percent and 95 percent, 100 percent completed plans, and the final bid ready submittal at the scheduled milestones. These submittals will include but not limited to design drawings, a specification table of contents (and/or special specifications, as applicable), and a construction cost estimate.
Appears in 2 contracts
Sources: Professional Services, Professional Services