Traffic Management 9.2.1 During the Operating Period, Developer shall be responsible for the general management of traffic on the Project. Developer shall manage traffic so as to preserve and protect safety of traffic on the Project and Related Transportation Facilities and, to the maximum extent practicable, to avoid disruption, interruption or other adverse effects on traffic flow, throughput or level of service on the Project and Related Transportation Facilities. Developer shall conduct traffic management in accordance with all applicable Technical Provisions, Technical Documents, Laws and Governmental Approvals, and in accordance with the Traffic Management Plan. 9.2.2 Developer shall prepare and submit to TxDOT and the Independent Engineer for TxDOT approval a Traffic Management Plan for managing traffic on the Project and Related Transportation Facilities after the commencement of traffic operations on any portion of the Project, addressing (a) orderly and safe movement and diversion of traffic on Related Transportation Facilities during Project construction, (b) orderly and safe movement of traffic on the Project and (c) orderly and safe diversion of traffic on the Project and Related Transportation Facilities necessary in connection with field maintenance and repair work or Renewal Work or in response to Incidents, Emergencies and lane closures. Developer shall prepare the Traffic Management Plan according to the schedule set forth in the Technical Provisions. The Traffic Management Plan shall comply with the Technical Provisions and Technical Documents concerning traffic management and traffic operations. Developer shall carry out all traffic management during the Term in accordance with the approved Traffic Management Plan. 9.2.3 Developer shall implement the Traffic Management Plan to promote safe and efficient operation of the Project and Related Transportation Facilities at all times during the course of any construction or operation of the Project and during the Utility Adjustment Work. 9.2.4 TxDOT shall have at all times, without obligation or liability to Developer, the right 9.2.4.1 Issue Directive Letters to Developer regarding traffic management 9.2.4.2 Provide on the Project, via message signs or other means consistent with Good Industry Practice, non-Discriminatory traveler and driver information, and other public information (e.g. amber alerts), provided that the means to disseminate such information does not materially interfere with the functioning of the ETCS.
Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection ▇▇▇▇▇; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.
High Risk Activities 1. The Software is not fault-tolerant and is not designed, manufactured or intended for use or resale as on-line control equipment in hazardous environments requiring fail-safe performance, such as in the operation of nuclear facilities, aircraft navigation or communication systems, air traffic control, direct life support machines, or weapons systems, in which the failure of the Software could lead directly to death, personal injury, or severe physical or environmental damage ("High Risk Activities"). Syncro and its suppliers specifically disclaim any express or implied warranty of fitness for High Risk Activities.
PROJECT ACTIVITIES This Grant Agreement is for the Foundational Year only. Subsection 1. Continuous SIA Plan Implementation (a) Increasing instructional time, which may include: (A) More hours or days of instructional time; (B) Summer programs; (C) Before-school or after-school programs; or (D) Technological investments that minimize class time used for assessments administered to students. (b) Addressing students’ health or safety needs, which may include: (A) Social-emotional learning and development; (B) Student mental and behavioral health; (C) Improvements to teaching and learning practices or organizational structures that lead to better interpersonal relationships at the school; (D) Student health and wellness; (E) Trauma-informed practices; (F) School health professionals and assistants; or (G) Facility improvements directly related to improving student health or safety. (c) Reducing class sizes, which may include increasing the use of instructional assistants, by using evidence-based criteria to ensure appropriate student-teacher ratios or staff caseloads. (d) Expanding availability of and student participation in well-rounded learning experiences, which may include: (A) Developmentally appropriate and culturally responsive early literacy practices and programs in prekindergarten through third grade; (B) Culturally responsive practices and programs in grades six through eight, including learning, counseling and student support that is connected to colleges and careers; (C) Broadened curricular options at all grade levels, including access to: (i) Art, music and physical education classes; (ii) Science, technology, engineering and mathematics education;
Program Management 1.1.01 Implement and operate an Immunization Program as a Responsible Entity 1.1.02 Identify at least one individual to act as the program contact in the following areas: 1. Immunization Program Manager;