UNDERWRITING AND CREDIT SLA; PROBLEM RESOLUTION; TERMINATION; FORECASTING Sample Clauses

UNDERWRITING AND CREDIT SLA; PROBLEM RESOLUTION; TERMINATION; FORECASTING. 4.1 [*] 4.2 Problem Resolution (Service Levels) FIGURE 1: Problem Classification Table

Related to UNDERWRITING AND CREDIT SLA; PROBLEM RESOLUTION; TERMINATION; FORECASTING

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities (including required control technologies and protection systems) and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer’s Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Required Procurement Procedures for Obtaining Goods and Services The Grantee shall provide maximum open competition when procuring goods and services related to the grant- assisted project in accordance with Section 287.057, Florida Statutes.

  • Post-Commercial Operation Date Testing and Modifications Developer and Connecting Transmission Owner shall each at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice and Applicable Reliability Standards as may be necessary to ensure the continued interconnection of the Large Generating Facility with the New York State Transmission System in a safe and reliable manner. Developer and Connecting Transmission Owner shall each have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Termination for Refusing Access to Public Records In accordance with section 287.058, F.S., the Department may unilaterally terminate the Term Contract for refusal by the Contractor to allow public access to all documents, papers, letters, or other material made or received by the Contractor in conjunction with the Term Contract, unless the records are exempt from s. 24(a) of Art. I of the State Constitution and section 119.071(1), F.S.

  • HHS Single Audit Unit will notify Grantee to complete the Single Audit Determination Form If Grantee fails to complete the form within thirty (30) calendar days after receipt of notice, Grantee maybe subject to sanctions and remedies for non-compliance.