Updated Information Submission by Interconnection Customer. The updated information submission by Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Interconnection Customer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to Transmission Provider for the Feasibility and Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Provider standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If Interconnection Customer's data is materially different from what was originally provided to Transmission Provider pursuant to the Interconnection Study Agreement between Transmission Provider and Interconnection Customer, then Transmission Provider will conduct appropriate studies to determine the impact on Transmission Provider Transmission System based on the actual data submitted pursuant to this Article
Appears in 9 contracts
Sources: Standard Large Generator Interconnection Agreement (Lgia), Standard Large Generator Interconnection Agreement (Lgia), Provisional Large Generator Interconnection Agreement
Updated Information Submission by Interconnection Customer. The updated information submission by Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Interconnection Customer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to Transmission Provider for the Feasibility and Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Provider standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If Interconnection Customer's data is materially different from what was originally provided to Transmission Provider pursuant to the Interconnection Study Agreement between Transmission Provider and Interconnection Customer, then Transmission Provider will conduct appropriate studies to determine the impact on Transmission Provider Transmission System based on the actual data submitted pursuant to this ArticleArticle 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 9 contracts
Sources: Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement (Lgia), Standard Large Generator Interconnection Agreement (Lgia)
Updated Information Submission by Interconnection Customer. The updated information submission by Interconnection CustomerCustomer to Transmission Provider, with copy to Transmission Owner, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Interconnection Customer shall submit to Transmission Provider and Transmission Owner a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIPGIP. It shall also include any additional information provided to Transmission Provider for the Feasibility and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Provider standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties Transmission Provider and Interconnection Customer to develop and supply a standard model and associated information. If the Interconnection Customer's ’s data is materially different from what was originally provided to Transmission Provider pursuant to the Interconnection Study Agreement between Transmission Provider and Interconnection Customer, then Transmission Provider will conduct appropriate studies to determine the impact on Transmission Provider the Transmission System based on the actual data submitted pursuant to this ArticleArticle 24.3. Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 8 contracts
Sources: Generator Interconnection Agreement (Gia), Generator Interconnection Agreement (Gia), Generator Interconnection Agreement (Gia)
Updated Information Submission by Interconnection Customer. The updated information submission by Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Interconnection Customer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIPSGIP. It shall also include any additional information provided to Transmission Provider for the Interconnection Feasibility Study and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Provider standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If Interconnection Customer's data is materially different from what was originally provided to Transmission Provider pursuant to the Interconnection Combined Study Agreement between Transmission Provider and Interconnection Customer, then Transmission Provider will conduct appropriate studies to determine the impact on Transmission Provider Transmission System based on the actual data submitted pursuant to this ArticleArticle 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 5 contracts
Sources: Standard Generator Interconnection Agreement (Sgia), Standard Generator Interconnection Agreement (Sgia), Standard Generator Interconnection Agreement (Sgia)
Updated Information Submission by Interconnection Customer. The updated information submission by Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Interconnection Customer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIPGIP. It shall also include any additional information provided to Transmission Distribution Provider for the Feasibility and Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Distribution Provider standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If Interconnection Customer's data is materially different from what was originally provided to Transmission Distribution Provider pursuant to the Interconnection Study Agreement between Transmission Distribution Provider and Interconnection Customer, then Transmission Distribution Provider will conduct appropriate studies to determine the impact on Transmission Distribution Provider Distribution System and Transmission System based on the actual data submitted pursuant to this ArticleArticle 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 5 contracts
Sources: Generator Interconnection Agreement, Generator Interconnection Agreement, Generator Interconnection Agreement
Updated Information Submission by Interconnection Customer. The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial OperationInitial Synchronization Date. Interconnection Customer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIPGIP. It shall also include any additional information provided to Transmission Provider for the Interconnection Feasibility and Interconnection Facilities StudyStudies. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Provider standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Interconnection Customer's data is materially different from what was originally provided to Transmission Provider pursuant to the Interconnection Study Agreement agreements between Transmission Provider and Interconnection Customer, then Transmission Provider will conduct appropriate studies to determine the impact on Transmission Provider the Transmission System based on the actual data submitted pursuant to this ArticleArticle 5.10.4. The Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 5 contracts
Sources: Generator Interconnection Agreement, Generator Interconnection Agreement, Interconnection Agreement
Updated Information Submission by Interconnection Customer. The updated information submission by Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Interconnection Customer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to Transmission Provider for the Interconnection Feasibility Study and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Provider standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If Interconnection Customer's data is materially different from what was originally provided to Transmission Provider pursuant to the Interconnection Study Agreement between Transmission Provider and Interconnection Customer, then Transmission Provider will conduct appropriate studies to determine the impact on Transmission Provider Provider’s Transmission System based on the actual data submitted pursuant to this ArticleArticle 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 2 contracts
Sources: Standard Large Generator Interconnection Agreement (Lgia), Standard Large Generator Interconnection Agreement (Lgia)
Updated Information Submission by Interconnection Customer. The updated information submission by Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days calendar days prior to the commencement of Trial Operation. Interconnection Customer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to as reasonably requested by IPA, including updates of the LGIP. It shall also include any additional information provided to Transmission Provider IPA for the Feasibility and Facilities StudyInterconnection Studies. Information in this submission shall be the most current Large Generating Facility design or and expected performance data. Information submitted for stability models shall be compatible with Transmission Provider IPA standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If Interconnection Customer's ’s data is materially different from what was originally provided to Transmission Provider pursuant to IPA in connection with the Interconnection Study Agreement between Transmission Provider and Studies, then IPA may conduct, at Interconnection Customer’s expense, then Transmission Provider will conduct appropriate studies to determine the impact of the Generating Facilities and the Interconnection Facilities and the operation thereof on Transmission Provider the Transmission System based on the actual data submitted pursuant to this ArticleSection 23.3. Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 2 contracts
Sources: Generator Interconnection Agreement, Generator Interconnection Agreement
Updated Information Submission by Interconnection Customer. The updated information submission by Interconnection CustomerCustomer to Transmission Provider, with copy to Transmission Owner, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Interconnection Customer shall submit to Transmission Provider and Transmission Owner a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIPGIP. It shall also include any additional information provided to Transmission Provider for the Interconnection Feasibility Study and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Provider standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties Transmission Provider and Interconnection Customer to develop and supply a standard model and associated information. If the Interconnection Customer's ’s data is materially different from what was originally provided to Transmission Provider pursuant to the Interconnection Study Agreement between Transmission Provider and Interconnection Customer, then Transmission Provider will conduct appropriate studies to determine the impact on Transmission Provider the Transmission System based on the actual data submitted pursuant to this ArticleArticle 24.3. Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 2 contracts
Sources: Generator Interconnection Agreement, Generator Interconnection Agreement (ITC Holdings Corp.)
Updated Information Submission by Interconnection Customer. The updated information submission by Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Interconnection Customer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to Transmission Provider for the Feasibility Cluster Study and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Provider standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If Interconnection Customer's data is materially different from what was originally provided to Transmission Provider pursuant to the Interconnection Study Agreement between Transmission Provider and Interconnection Customer, then Transmission Provider will conduct appropriate studies to determine the impact on Transmission Provider Transmission System based on the actual data submitted pursuant to this ArticleArticle 24.3. Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 2 contracts
Sources: Standard Large Generator Interconnection Agreement (Lgia), Standard Large Generator Interconnection Agreement (Lgia)
Updated Information Submission by Interconnection Customer. The updated information submission by Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Interconnection Customer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIPCLGIP. It shall also include any additional information provided to Transmission Distribution Provider for the Feasibility and Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Distribution Provider standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. information. If Interconnection Customer's data is materially different from what was originally provided to Transmission Distribution Provider pursuant to the Interconnection Study Agreement between Transmission Distribution Provider and Interconnection Customer, then Transmission Distribution Provider will conduct appropriate studies to determine the impact on Transmission Distribution Provider Distribution System and Transmission System based on the actual data submitted pursuant to this ArticleArticle 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 1 contract
Sources: Clustering Large Generator Interconnection Agreement and Distribution Service Agreement
Updated Information Submission by Interconnection Customer. The updated information submission by Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Interconnection Customer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to Transmission Distribution Provider for the Feasibility and Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Distribution Provider standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If Interconnection Customer's data is materially different from what was originally provided to Transmission Distribution Provider pursuant to the Interconnection Study Agreement between Transmission Distribution Provider and Interconnection Customer, then Transmission Distribution Provider will conduct appropriate studies to determine the impact on Transmission Distribution Provider Distribution System and Transmission System based on the actual data submitted pursuant to this ArticleArticle 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 1 contract
Sources: Service Agreement for Wholesale Distribution Service
Updated Information Submission by Interconnection Customer. The updated information submission by Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Interconnection Customer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIPGIPCLGIP. It shall also include any additional information provided to Transmission Distribution Provider for the Feasibility and Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Distribution Provider standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If Interconnection Customer's data is materially different from what was originally provided to Transmission Distribution Provider pursuant to the Interconnection Study Agreement between Transmission Distribution Provider and Interconnection Customer, then Transmission Distribution Provider will conduct appropriate studies to determine the impact on Transmission Distribution Provider Distribution System and Transmission System based on the actual data submitted pursuant to this ArticleArticle 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 1 contract
Sources: Clustering Large Generator Interconnection Agreement (Giaclgia)
Updated Information Submission by Interconnection Customer. The All updated information submission by Interconnection Customer, including manufacturer informationinformation and any revision to the Large Generating Facility data requirements contained in Appendix 1 to the LGIP, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Interconnection Customer Additionally, such updated information submission shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to Transmission Provider for the Feasibility and Facilities StudyInterconnection Studies. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Provider standard models. If there is no compatible model, Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If Interconnection Customer's data is materially different from what was originally provided to Transmission Provider pursuant to the Interconnection Study Agreement agreement between Transmission Provider and Interconnection Customer, then Transmission Provider will conduct appropriate studies studies, at Interconnection Customer’s expense, to determine the impact on Transmission Provider Provider’s Transmission System based on the actual data submitted pursuant to this Article
Appears in 1 contract
Updated Information Submission by Interconnection Customer. The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial OperationInitial Synchronization Date. Interconnection Customer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to Transmission Provider for the Interconnection Feasibility and Interconnection Facilities StudyStudies. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with Transmission Provider standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Interconnection Customer's data is materially different from what was originally provided to Transmission Provider pursuant to the Interconnection Study Agreement agreements between Transmission Provider and Interconnection Customer, then Transmission Provider will conduct appropriate studies to determine the impact on Transmission Provider the Transmission System based on the actual data submitted pursuant to this ArticleArticle 5.10.4. The Interconnection Customer shall not begin Trial Operation until such studies are completed.
Appears in 1 contract
Sources: Interconnection Agreement