Use of Completed Portions of the Work Clause Samples

The "Use of Completed Portions of the Work" clause defines the rights and conditions under which a party may utilize parts of a project that have been finished, even if the entire project is not yet complete or is terminated early. Typically, this clause allows the client to take possession of and use any completed deliverables or sections of the work, such as finished drawings, reports, or constructed elements, regardless of the status of the remaining work. Its core practical function is to ensure that the client can benefit from and make use of completed work products, thereby minimizing wasted effort and resources if the contract is ended before full completion.
POPULAR SAMPLE Copied 6 times
Use of Completed Portions of the Work. 1. After Substantial Completion of the Work in any space(s) in the Project, the Commission will have the right to use and occupy such space(s) in advance of Final Completion and Acceptance of the Work, provided that the Commission’s occupancy and use of such spaces will not unduly interfere with the Design-Builder’s operations nor delay completion of the Work. Occupancy and use of any space(s) in the building by the Commission or User Agency will not constitute Substantial Completion in the absence of written notification of Substantial Completion of the affected portion of the Work from the Architect. This document is provided as a DRAFT and is not intended to be considered FINAL. The Commission explicitly reserves the right to modify this document and provide a revised Sample to Phase II Proposers. 2. If the Commission desires to exercise the right of partial occupancy prior to Substantial Completion and Final Completion and Acceptance of the Work as provided below, the Design-Builder will cooperate with the Commission in making available for the Commission’s use such services as heating, ventilating, cooling, water, lighting, and telephone for the space(s) to be occupied. If the equipment required to furnish such services is not entirely complete at the time the Commission desires to occupy the aforesaid space(s), the Design-Builder will make all reasonable efforts to complete it as soon as possible. The cost of utilities to partially or temporarily occupied Work pursuant to this Section 12.05 is a cost of the Work, unless the Commission notifies Design-Builder otherwise prior to use of such utilities. 3. The Commission’s occupancy or use of such space(s) in the Project will not constitute the Commission’s acceptance of any Work, materials, or equipment which are not in accordance with the requirements of the Contract Documents, nor relieve the Design-Builder from its obligations or responsibilities under the Contract. SAMPLE 4. In any case, when the Commission occupies or begins to use any portion of the Work pursuant to this Section 12.05, the Commission will give the Design-Builder notice in writing of its occupancy and/or use of the space(s) involved.
Use of Completed Portions of the Work. Company shall have the right to take possession of and use any completed or partially completed portions of the Work, notwithstanding that the time for completing the entire Work or such portions thereof may not have expired, but such taking possession and use shall not be deemed an acceptance of any Work not completed as specified. If such prior use increases the cost of or delays the Work, Contractor shall be entitled to an equitable adjustment in its compensation and time allowed for performance.
Use of Completed Portions of the Work. 41.1 The Owner shall have the right to take possession of and use any completed or partially completed portions of the Work, notwithstanding that the time for completing the entire Work or such portions of the Work may not have expired; but such taking possession of and use shall not be deemed an acceptance of the Work. 41.2 If such prior use increases the cost of the Work, the Contractor shall be entitled to such compensation as the Engineer in the first instance may determine. 41.3 If a planned taking possession of and use of portions of the Work has been stipulated in the Contract Documents, then the Contractor shall have no claim for compensation on that account.
Use of Completed Portions of the Work. A. Whenever Company determines that any portion of the Work performed by Contractor is in a condition suitable for use, and the best interest of Company requires such use, Company may take possession of or use such portion. B. Such use by Company shall in no event be construed as constituting acceptance, and shall neither relieve Contractor of any of its responsibilities under the Agreement, nor act as a waiver by Company of any of the terms and conditions, provided that Contractor shall not be liable for the cost of repairs, rework, or renewals which may be required due to ordinary wear and tear resulting from such use. C. If, as a result of Contractor’s failure to comply with the provisions of the Agreement, such use is unsatisfactory to Company, Company shall have the right to continue such use until such portion of the Work can, without adversely affecting Company, be taken out of service for correction of defects, errors, omissions, or replacement of unsatisfactory materials or equipment by Contractor, as necessary for such Work to comply with the Agreement, provided that the period of such operation or use pending completion of appropriate remedial action shall not exceed twelve (12) months, unless otherwise mutually agreed upon in writing between the parties.
Use of Completed Portions of the Work. The Owner shall have the right to take possession of and use any completed or partially completed portion of the work, notwithstanding that the time for completing the entire work or such portions of the work may not have expired; but such taking possession and use shall not be deemed to be acceptance of any work not completed in accordance with the Plans, Specifications, and Contract Documents. If such prior use should increase the cost of or delay the completion of uncompleted work, or should cause refinishing of completed work subjected to such prior use, the Contractor shall be entitled to extra compensation or extension of time, or both, as agreed upon by the Owner.
Use of Completed Portions of the Work. The City shall have the right to take possession of and use any completed or partially completed portions of the Work, notwithstanding the fact that the time for completing the entire Work or such portions may not have expired. Such taking of possession and use will not be deemed an acceptance of any Work not completed. If such possession and use increases the cost of or delays the Work, Contractor shall be entitled to a Change Order for extra compensation, or extension of time, as necessary, to offset the effect of such prior possession and use.

Related to Use of Completed Portions of the Work

  • Conditions to Obligations of Each Party Under This Agreement The respective obligations of each party to effect the Merger and the other transactions contemplated herein shall be subject to the satisfaction at or prior to the Effective Time of the following conditions, any or all of which may be waived, in whole or in part, to the extent permitted by applicable Law:

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.

  • Conditions of Exercise Unless otherwise determined by the Board in its sole discretion, the Option will be exercisable only in accordance with the conditions stated in this Section 3. (a) Except as otherwise provided in Section 10.1(b) of the Plan or in the last sentence of this Section 3(a), the Option will not be exercisable until the Initial Vesting Date and may be exercised thereafter only to the extent it has become exercisable in accordance with the following schedule: (i) On and after the Initial Vesting Date, the Option shall be exercisable as to 33.34% of the Option Shares; (ii) On and after the second Annual Meeting Date following the Effective Date, the Option shall be exercisable as to 66.67% of the Option Shares; and (iii) On and after the third Annual Meeting Date following the Effective Date, the Option shall be exercisable as to 100% of the Option Shares. [Please refer to the website of the Third Party Administrator for the specific vesting schedule related to the exercisability of the Option (click on the specific grant under the tab labeled “Grants/Award/Units”).] Notwithstanding the foregoing, the Option will become exercisable in full on the date of the Grantee’s termination of service as a Nonemployee Director if (i) the Grantee’s service as a Nonemployee Director terminates by reason of Disability or (ii) the Grantee dies while serving as a Nonemployee Director. (b) To the extent the Option becomes exercisable, the Option may be exercised in whole or in part (at any time or from time to time, except as otherwise provided herein) until expiration of the Term or earlier termination thereof. (c) The Grantee acknowledges and agrees that the Board may, in its discretion and as contemplated by Section 3.3 of the Plan, adopt rules and regulations from time to time after the date hereof with respect to the exercise of the Option and that the exercise by the Grantee of the Option will be subject to the further condition that such exercise is made in accordance with all such rules and regulations as the Board may determine are applicable thereto.

  • Modifications and Updates to the Wire Center List and Subsequent Transition Periods 5.4.6.1 In the event AT&T identifies additional wire centers that meet the criteria set forth in Sections 5.4.2.1 or 5.4.2.2 above, but that were not included in the Master List of Unimpaired Wire Centers or AT&T’s List of Unimpaired Wire Centers, AT&T shall include such additional wire centers in a CNL. Each such list of additional wire centers shall be considered a Subsequent Wire Center List. AT&T will follow any limitations on the frequency with which it may issue such lists and notification procedures set forth in applicable Commission orders. 5.4.6.2 TWTC shall have thirty (30) business days to dispute the additional wire centers listed on AT&T’s CNL. Absent such dispute, effective thirty (30) business days after the date of a AT&T CNL providing a Subsequent Wire Center List, AT&T shall not be required to provide DS1 and DS3 Dedicated Transport, as applicable, in such additional wire center(s), except pursuant to the self-certification process as set forth in Section 1.9.1 of this Attachment. 5.4.6.3 For purposes of Section 5.4.6.1 above, AT&T shall make available DS1 and DS3 Dedicated Transport that were in service for TWTC in a wire center on the Subsequent Wire Center List as of the thirtieth (30th) business day after the date of AT&T’s CNL identifying the Subsequent Wire Center List (Subsequent Embedded Base) until one hundred eighty (180) days after the thirtieth (30th) business day Version: 4Q06 Standard ICA 11/30/06 from the date of AT&T’s CNL identifying the Subsequent Wire Center List (Subsequent Transition Period). 5.4.6.4 The rates set forth in Exhibit B shall apply to the Subsequent Embedded Base during the Subsequent Transition Period. 5.4.6.5 No later than one hundred eighty (180) days from AT&T’s CNL identifying the Subsequent Wire Center List, TWTC shall submit an LSR(s) or spreadsheet(s) as applicable, identifying the Subsequent Embedded Base of circuits to be disconnected or converted to other AT&T services. 5.4.6.5.1 In the case of disconnection, the applicable disconnect charges set forth in this Agreement shall apply. 5.4.6.5.2 If TWTC chooses to convert DS1 and/or DS3 Dedicated Transport to special access circuits in existence as of the Effective Date of this Agreement, AT&T will include such DS1 and/or DS3 Dedicated Transport within TWTC’s total special access circuits, and apply any discounts to which TWTC is entitled from the transition period of 3/11/2006 to the conversion date. Conversions will be subject to the switch-as-is charge set forth in Exhibit A to this Attachment 2. 5.4.6.5.3 AT&T shall not impose disconnect or nonrecurring installation charges when transitioning the Subsequent Embedded Base of DS1 and DS3 Dedicated Transport in existence as of the Effective Date of this Agreement. 5.4.6.6 If TWTC fails to submit the LSR(s) or spreadsheet(s) for all of its Subsequent Embedded Base by one hundred eighty (180) days after the date of AT&T’s CNL identifying the Subsequent Wire Center List, AT&T will identify TWTC’s remaining Subsequent Embedded Base, if any, and will transition such circuits to the equivalent tariffed AT&T service(s), or in the case of Georgia, to the equivalent 271 service(s) set forth in Exhibit 1. In the states of Florida, Kentucky, Mississippi and South Carolina, those circuits identified and transitioned by AT&T shall be subject to the applicable disconnect charges as set forth in this Agreement and the full nonrecurring charges for installation of the equivalent tariffed AT&T service as set forth in AT&T’s tariffs. In the states of Alabama, Georgia, North Carolina and Tennessee, those circuits identified and transitioned by AT&T shall be subject to the applicable switch-as-is rates set forth in Exhibit A of Attachment

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following: