Use of Work Site. Contractor’s use of the Work Site is limited by Owner’s needs for continuity of the Fire Stations’ operations and Contractor shall allow for Owner occupancy and continued operations, as well as use by the public. A. Contractor shall keep all driveways and entrances serving the Work Site clear and available to Owner, Owner’s employees, and the public at all times. Contractor may not use these areas for parking or storage of materials. Contractor must schedule deliveries to minimize space and time requirements for storage of materials and equipment at the Work Site. B. Contractor shall move all stored materials or equipment which interfere with the operations of Owner or other contractors. C. The Work Site is open between the hours of 7:00 a.m. and 4:00 p.m. on weekdays, holidays excluded. All Work at the Work Site must be performed when the Work Site is open. In the event that Contractor needs to perform Work at a time the Work Site is not open, Contractor must obtain Owner’s prior approval, which approval Owner may withhold in its sole discretion. D. Construction shall not substantially interrupt Village operations or movement of Village vehicles in and out of the Work Site. Contractor shall coordinate deliveries of materials to ensure access is maintained for Village vehicles. Contractor parking, staging, material storage, and portable lavatory locations shall be approved by the Village. E. Owner will occupy the Work Site and the existing buildings during the entire construction period. Contractor shall cooperate with the Owner during construction operations to minimize conflicts and facilitate Owner and public usage. Contractor shall perform the Work so as to minimize interference with operations. Should there be a need to interrupt any services deemed critical to allow Owner’s personnel to carry out their duties, prior written approval must be granted by Owner.
Appears in 2 contracts
Sources: Design/Build Services Agreement, Design/Build Services Agreement