Utility Requirements. The Contractor is advised of the existence of the utility notification service provided by UNDERGROUND SERVICE ALERT (USA). USA member utilities will provide the Contractor with the precise locations of their substructures in the construction area when the Contractor gives at least 48-hours’ notice to the Underground Service Alert by calling ▇-▇▇▇-▇▇▇-▇▇▇▇. The location and existence of utilities and improvements shown on the plans are approximate and taken from available records. The Contractor shall verify the location of existing improvements and shall take all precautions to protect them whether shown or not. The Contractor shall notify the following agencies at least 48 hours in advance of excavating around any of their structures. The utility companies listed below can be contacted as indicated. It shall be the responsibility of the Contractor to coordinate all phases of construction with the various utility companies involved. 1. The Gas Company Protection of existing facilities by Contractor. ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇▇ Redlands, CA 92374 Contact: ▇▇▇▇▇▇▇ ▇▇▇▇▇ Tel: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ 2. Southern California Edison Company (SCE) Protection of existing facilities by Contractor. Adjustment or relocation of facilities as shown on the plans by SCE. ▇▇-▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇ Cathedral City, CA 92234 Contact: ▇▇▇▇▇▇▇ ▇▇▇▇ Tel: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇▇.▇▇▇▇@▇▇▇.▇▇▇ 3. Verizon Protection of existing facilities by Contractor. Adjustment or relocation of facilities as shown on the plans by Verizon. ▇▇▇ ▇. ▇▇▇▇▇▇▇ ▇▇▇ Palm Springs, CA 92262 Contact: ▇▇▇▇▇ ▇▇▇▇▇ Tel: ▇▇▇-▇▇▇-▇▇▇▇ Fax: ▇▇▇-▇▇▇-▇▇▇▇ 4. Coachella Valley Water District Protection of existing facilities. Adjustment or relocation of facilities by the Contractor. ▇.▇. ▇▇▇ 1058 Coachella, CA 92236 Contact: ▇▇▇▇▇ ▇▇▇▇ Tel: ▇▇▇-▇▇▇-▇▇▇▇ Fax: ▇▇▇-▇▇▇-▇▇▇▇ ▇▇▇▇▇@▇▇▇▇.▇▇▇ 5. Time-Warner Cable Protection of existing facilities by Contractor. Adjustment or relocation of facilities as shown on the plans by Time Warner ▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇ Indio, CA ▇▇▇▇▇-▇▇▇▇ Contact: ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Tel: ▇▇▇-▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇▇▇@▇▇▇▇▇▇▇.▇▇▇ 6. City of Palm Desert a. Protection of existing traffic signal and interconnect facilities b. ▇▇▇-▇▇▇-▇▇▇▇ The California Public Utilities Commission mandates that, in the interest of public safety, main line gas valves be maintained in a manner to be readily accessible and in good operating condition. The Contractor shall notify the Southern California Gas Company's Headquarters Planning Office at (▇▇▇) ▇▇▇-▇▇▇▇ at least two (2) working days prior to the start of construction. The Contractor shall coordinate installation of utility facilities within the project with the inspector listed above as contact. Requests for information not shown on the specific utility installation plan shall be directed to the contact for that utility. The exact location and identification of all existing utilities shall be determined by the Contractor prior to the start of any work. The Contractor shall protect-in-place all utilities unless otherwise noted on the plans. All existing city-owned utilities located in sidewalk, driveway approach, access ramp or any area requiring grade adjustment due to the proposed improvements shall be considered appurtenant to the bid item for which the adjustment is required.
Appears in 1 contract
Sources: Maintenance Services Agreement
Utility Requirements. The Contractor is advised of the existence of the utility notification service provided by UNDERGROUND SERVICE ALERT (USA). USA member utilities will provide the Contractor with the precise locations of their substructures in the construction area when the Contractor gives at least 48-hours’ notice to the Underground Service Alert by calling ▇-▇▇▇-▇▇▇-▇▇▇▇. The location and existence of utilities and improvements shown on the plans are approximate and taken from available records. The Contractor shall verify the location of existing improvements and shall take all precautions to protect them whether shown or not. The Contractor shall notify the following agencies at least 48 hours in advance of excavating around any of their structures. The utility companies listed below can be contacted as indicated. It shall be the responsibility of the Contractor to coordinate all phases of construction with the various utility companies involved.
1. The Gas Company Protection of existing facilities by Contractor. ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇▇ 1981 West Lugonia Avenue Redlands, CA 92374 Contact: ▇▇▇▇▇▇▇ ▇▇▇▇▇ Tel: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇
2. Southern California Edison Company (SCE) Protection of existing facilities by Contractor. Adjustment or relocation of facilities as shown on the plans by SCE. ▇▇-▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇ Cathedral City, CA 92234 Contact: ▇▇▇▇▇▇▇ ▇▇▇▇ Tel: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇▇.▇▇▇▇@▇▇▇.▇▇▇
3. Verizon Protection of existing facilities by Contractor. Adjustment or relocation of facilities as shown on the plans by Verizon. ▇▇▇ ▇. ▇▇▇▇▇▇▇ ▇▇▇ Palm Springs, CA 92262 Contact: ▇▇▇▇▇ ▇▇▇▇▇ Tel: ▇▇▇-▇▇▇-▇▇▇▇ Fax: ▇▇▇-▇▇▇-▇▇▇▇
4. Coachella Valley Water District Protection of existing facilities. Adjustment or relocation of facilities by the Contractor. ▇.▇. ▇▇▇ 1058 Coachella, CA 92236 Contact: ▇▇▇▇▇ ▇▇▇▇ Tel: ▇▇▇-▇▇▇-▇▇▇▇ Fax: ▇▇▇-▇▇▇-▇▇▇▇ ▇▇▇▇▇@▇▇▇▇.▇▇▇
5. Time-Warner Cable Protection of existing facilities by Contractor. Adjustment or relocation of facilities as shown on the plans by Time Warner ▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇ Indio, CA ▇▇▇▇▇-▇▇▇▇ Contact: ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Tel: ▇▇▇-▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇▇▇@▇▇▇▇▇▇▇.▇▇▇
6. City of Palm Desert
a. Protection of existing traffic signal and interconnect facilities b. ▇▇▇-▇▇▇-▇▇▇▇ The California Public Utilities Commission mandates that, in the interest of public safety, main line gas valves be maintained in a manner to be readily accessible and in good operating condition. The Contractor shall notify the Southern California Gas Company's Headquarters Planning Office at (▇▇▇) ▇▇▇-▇▇▇▇ at least two (2) working days prior to the start of construction. The Contractor shall coordinate installation of utility facilities within the project with the inspector listed above as contact. Requests for information not shown on the specific utility installation plan shall be directed to the contact for that utility. The exact location and identification of all existing utilities shall be determined by the Contractor prior to the start of any work. The Contractor shall protect-in-place all utilities unless otherwise noted on the plans. All existing city-owned utilities located in sidewalk, driveway approach, access ramp or any area requiring grade adjustment due to the proposed improvements shall be considered appurtenant to the bid item for which the adjustment is required.