Valves. A. Valves shall be installed where shown on plans and elsewhere as necessary for the proper operation or balancing of the systems. B. At completion, this contractor shall install stamped brass tag on each valve held on with brass drain (except on fan-coil unit valves) with numbers. This contractor is to make up schedule with number of each valve. Schedule to describe use of each valve. One copy of schedule to be framed under glass and hung in boiler room. Two more copies are to be supplied to the Engineer. C. Extreme care must be used in locating fin tube radiation valves and fittings in order that they shall be installed so as to be readily accessible. D. Install on each coil a key type compression air valve.
Appears in 4 contracts
Sources: Construction Contract, Construction Contract, Construction Contract