Visual Inspection. Approximate quantities, as indicated below, of some materials may be accepted on the basis of visual inspection: • Aggregates other than for use in Portland Cement Concrete, not to exceed: o 100 tons per day, nor o 500 tons per project; • Bituminous Mixtures, e.g. hot mix asphalt, not to exceed: o 50 tons per day, nor o If project total is less than 500 tons., sample at RE’s discretion; and • Bituminous materials, e.g. liquid asphalt, not to exceed: o 100 per project. Relatively minor quantities of construction materials may be accepted without testing if the following three conditions are met: