Voltage Optimization Sample Clauses

Voltage Optimization. The Parties agree that, consistent with the stipulation reached in ICC Docket No. 18-0211, Ameren Illinois will assess future investments in voltage optimization (“VO”) using a total resource cost test that includes assessment of quantifiable peak demand savings and, when appropriate, updated cost estimates. The Parties also agree that any VO investment considerations by Ameren Illinois will be subject to the information and analysis available at the time of the investment and no additional obligations or investment obligations are being undertaken pursuant to this Stipulation. The Parties acknowledge that any VO investments to be considered or made in the next plan cycle (comprising calendar years 2026-2030) can be the subject of future discussions between the Parties relating to that plan cycle.
Voltage Optimization. The Parties agree that, consistent with the stipulation reached in ICC Docket No. 18-0211, Ameren Illinois will assess future investments in voltage optimization (“VO”) using a total resource cost test that includes assessment of quantifiable peak demand savings and, when appropriate, updated cost estimates. The Parties also agree that any VO investment considerations by Ameren Illinois will be subject to the information and analysis available at the time of the investment and no additional obligations or investment obligations are being undertaken pursuant to this Stipulation. The Parties acknowledge that any VO investments to be considered or made in the next plan cycle (comprising calendar years 2030-2033) can be the subject of future discussions between the Parties relating to that plan cycle. The Parties further acknowledge VO investments approved by the Commission in Ameren Illinois' 2023-2027 Multi-Year Integrated Grid Plan in Docket No. 22-0487/23-0082/24-0238 will be claimed as EE savings. The Parties further acknowledge that the circuits not completed in the 2018 VO plan whose savings were not able to be claimed in the 2022-2025 energy efficiency plan are carried over into the 2025-2027 VO expansion plan and the MWH savings from the 2025- 2027 VO plan will be claimed in the 2026 Plan. 2 Gas Savings Goals included in Table 4 excludes the therms savings converted to electric savings and counted toward the electric goals. Table 5: Planned Voltage Optimization Savings3 2026 2027 2028 2029 Annual Savings (MWh) 30,000 25,000 20,000 0

Related to Voltage Optimization

  • Fabrication Making up data or results and recording or reporting them.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Screening The Health Plan must work with contracted providers to conduct interperiodic EPSDT screens on RIte Care and all ACA Adult Expansion Population members under age 21 (i.e. 19 and 20-year old under this Agreement) to identify health and developmental problems in conformance with ATTACHMENT ED to this Agreement. Additional screens should be provided as Medically Necessary. At a minimum, these screens must include: • A comprehensive health and developmental history, including health education, nutrition assessment, immunization history, and developmental assessment • Immunizations according to the Rhode Island EPSDT Periodicity Schedule • An unclothed physical examination • Laboratory tests including lead, TB, and newborn screenings as medically indicated • Vision testing • Hearing testing • Dental screening oral examination by PCP as part of a comprehensive examination required before age one (1) • All other medically indicated screening services • And provide EOHHS with a list of established CPT/HCPC codes used to identify all billable services included in the EPSDT schedule.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.