Volume Corrections for Temperature Sample Clauses

Volume Corrections for Temperature. Except in the case that quantity measurements are made pursuant to the provisions of Article 11.1(c), in which case temperature corrections shall be made in the manner and at the time specified in that Article, temperature readings shall be taken in accordance with the methods listed below in decreasing order of preference, depending on operational conditions prevailing at the Loading Port involved: (i) the flow-weighted average temperature taken at regular times during loading by Seller or its agents at flow meters; and (ii) the temperature taken in shore tanks by Seller or its agent. Temperature corrections at 60ºF (equivalent to 15.56ºC) will then be effected for all volume determinations in accordance with ASTM-1250 or API MPMS, Chapter 11.1, at Seller’s choice, provided that temperature corrections shall not be made in the case that volume is determined by way of flow meters pursuant to Article 11.1(a) and temperature compensators at 60º F (equivalent to 15.56º C) are integrated into the meter system. S & W, determined in the manner provided in Article 12.1(i), (ii) or (iii), as the case may be, and Article 12.2, shall be deducted from the volume corrected for temperature as provided above in order to arrive at the volume for purposes of the ▇▇▇▇ of lading and invoice.

Related to Volume Corrections for Temperature

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • Technical Specifications The purpose of the Technical Specifications (TS), is to define the technical characteristics of the Goods and Related Services required by the Procuring Entity. The Procuring Entity shall prepare the detailed TS consider that:

  • ODUF Packing Specifications 6.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.

  • Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.