Waste Handling. 5.2.1 The Contractor is obliged and undertakes to handle the waste in compliance with theAct no. 79/2015 Coll. on waste as amended (herreinafter as the “Waste Act“), in particular: a/ To prevent and reduce adverse impacts of waste production and dispose waste in accordance with the hierarchy of the waste management, b/ When performing contracting activity related to the generation of waste, to observe the instructions of the relevant technical supervision and environment unit of SE in line with the internal management regulations valid and applicable to waste in the respective power plant, or other undesired acts; the premises for the collection of waste shall be assigned to the Contractor by SE (relevant SE technical supervision), d/ To collect separately dangerous waste according to its classification, label them in the prescribed way (waste name, graphic symbol of hazardous characteristics and waste identification sheet.), to manage the waste in compliance with the Waste Act and related legislation, to protect the place of collection of hazardous waste against leakage of contaminants into the soil, water and air. The Contractor shall in connection with the performance allow the qualified personnel of SE (Environment Department and technical supervision of SE) to carry out inspection of handling with waste in order to check correctness of the used procedures.
Appears in 2 contracts
Sources: General Provisions, General Provisions