Timber Designations Timber designated for cutting shall be confined to Sale Area, except as provided in B2.131, B2.14, B2.15, B2.32, and B5. 1. Sale Area Map
No Liability for Election of Recommended Directors No Stockholder, nor any Affiliate of any Stockholder, shall have any liability as a result of designating a person for election as a director for any act or omission by such designated person in his or her capacity as a director of the Company, nor shall any Stockholder have any liability as a result of voting for any such designee in accordance with the provisions of this Agreement.
LEAST RESTRICTIVE ENVIRONMENT/DUAL ENROLLMENT CONTRACTOR and ▇▇▇ shall follow all LEA policies and procedures that support Least Restrictive Environment (“LRE”) options and/or dual enrollment options if available and appropriate, for students to have access to the general curriculum and to be educated with their nondisabled peers to the maximum extent appropriate. CONTRACTOR and ▇▇▇ shall ensure that LRE placement options are addressed at all IEP team meetings regarding students for whom ISAs have been or may be executed. This shall include IEP team consideration of supplementary aids and services, goals and objectives necessary for placement in the LRE and necessary to enable students to transition to less restrictive settings. When an IEP team has determined that a student should be transitioned into the public school setting, CONTRACTOR shall assist the LEA in implementing the IEP team’s recommended activities to support the transition.
Restricted Employment for Certain State Personnel Contractor acknowledges that, pursuant to Section 572.069 of the Texas Government Code, a former state officer or employee of a state agency who during the period of state service or employment participated on behalf of a state agency in a procurement or contract negotiation involving Contractor may not accept employment from Contractor before the second anniversary of the date the Contract is signed or the procurement is terminated or withdrawn.
Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame (MDF) to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (DAMLs), and may have up to 6,000 feet of bridged tap between the End User’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For Loops less than 18,000 feet and with less than 1300 Ohms resistance, the Loop will provide a voice grade transmission channel suitable for Loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point. 2.4.3.2 The UCL-ND facilities may be mechanically assigned using BellSouth’s assignment systems. Therefore, the Loop Makeup (LMU) process is not required to order and provision the UCL-ND. However, CBX One-Stop can request LMU for which additional charges would apply. 2.4.3.3 For an additional charge, BellSouth also will make available Loop Testing so that CBX One-Stop may request further testing on the UCL-ND. Rates for Loop Testing are as set forth in Exhibit A of this Attachment. 2.4.3.4 UCL-ND Loops are not intended to support any particular service and may be utilized by CBX One-Stop to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. The UCL- ND will include a NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire. 2.4.3.5 OC will be provided as a chargeable option and may be utilized when the UCL-ND provisioning is associated with the reuse of BellSouth facilities. OC-TS does not apply to this product. 2.4.3.6 CBX One-Stop may use BellSouth’s Unbundled Loop Modification (ULM) offering to remove excessive bridged taps and/or load coils from any copper Loop within the BellSouth network. Therefore, some Loops that would not qualify as UCL-ND could be transformed into Loops that do qualify, using the ULM process.