WORK MEASUREMENT/CERTIFICATION. a. The work to be performed being a specialized nature, the contractor should be fully conversant with modern practices and should be able to carry out works independently of large thermal power plant. The contractor shall therefore be required to engage qualified/ experienced personnel to undertake the work as per specifications and requirement. b. Contractor should maintain one computer with printer for keeping daily records and maintain the data. c. All the work measurements shall be jointly recorded in a measurement sheet/register/relevant documents by the contractor I authorized representative of the contractor and the Engineer-in- charge. The measurements shall be clearly written indicating date of measurement, location, reference to drawings, if any, and jointly signed. d. The Contractor shall be required to furnish satisfactory job completion report to GIPCL. The submission of report should be on daily basis, the monthly bill payment shall be released based on the certified reports of the works. e. Inspection of work will be done by Engineer in Charge or his authorized representative. If the work is not found satisfactory engineer in charge reserves the right to take suitable action and shall be binding to the contractor.
Appears in 1 contract
Sources: Biennial Rate Contract
WORK MEASUREMENT/CERTIFICATION. a. The work to be performed being a specialized nature, the contractor should be fully conversant with modern practices and should be able to carry out works independently of large thermal power plant. The contractor shall therefore be required to engage qualified/ experienced personnel to undertake the work as per specifications and requirement.
b. Contractor should maintain one computer with printer for keeping daily records and maintain the data.
c. All the work measurements shall be jointly recorded in a measurement sheet/register/relevant documents by the contractor I / authorized representative of the contractor and the Engineer-in- in-charge. The measurements shall be clearly written indicating date of measurement, location, reference to drawings, if any, and jointly signed.
d. The Contractor shall be required to furnish satisfactory job completion report to GIPCL. The submission of report should be on daily basis, the monthly bill payment shall be released based on the certified reports of the works.
e. Inspection of work will be done by Engineer in Charge or his authorized representative. If the work is not found satisfactory engineer in charge reserves the right to take suitable action and shall be binding to the contractor.