WORK ZONE TRAFFIC MANAGEMENT PLAN Clause Samples

The Work Zone Traffic Management Plan clause outlines the requirements and procedures for safely directing and controlling traffic in and around construction or maintenance work zones. It typically mandates the preparation and implementation of a detailed plan that addresses signage, barriers, detours, and the scheduling of lane closures to minimize disruption and ensure the safety of both workers and the public. By establishing clear guidelines for traffic flow and safety measures, this clause helps prevent accidents, reduces confusion, and maintains efficient movement through or around the work area.
WORK ZONE TRAFFIC MANAGEMENT PLAN. All traffic control shall conform to the latest version of the Manual of Uniform Traffic Control Devices (MUTCD). Contractor must maintain access to all residential and commercial properties at all times unless otherwise agreed upon by the engineer in writing. At least one lane of traffic will remain open at all times unless otherwise agreed upon by the engineer in writing.

Related to WORK ZONE TRAFFIC MANAGEMENT PLAN

  • Project Management Plan Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan and

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • Traffic Management 6.5.1 Developer shall be responsible for the management of traffic on (a) the New Harbor Bridge from NTP2 through the Term, (b) the Existing Harbor Bridge from issuance of NTP3 until Substantial Completion of Phase 2, and (c) all other portions of the Project from issuance of NTP2 until the expiration or earlier termination of the O&M Period. Developer shall manage traffic so as to preserve and protect safety of traffic on the Project and Related Transportation Facilities and, to the maximum extent practicable, to avoid disruption, interruption or other adverse effects on traffic flow, throughput or level of service on the Project and Related Transportation Facilities. Developer shall conduct traffic 6.5.2 Developer shall prepare and submit to TxDOT for its approval a Traffic Management Plan, addressing (a) orderly and safe movement and diversion of traffic on Related Transportation Facilities during Project construction, (b) from NTP3 through the date of Project Final Acceptance, orderly and safe movement and diversion of traffic on Phase 2 (c) throughout the Term, orderly and safe movement and diversion of traffic on Phase 1, and (c) orderly and safe diversion of traffic on the Project and Related Transportation Facilities necessary in connection with Renewal Work or with field maintenance and repair work in response to Incidents, Emergencies and lane closures. Developer shall prepare the Traffic Management Plan according to the schedule set forth in the Technical Provisions. The Traffic Management Plan shall comply with the Technical Provisions concerning traffic management and traffic operations. Developer shall carry out all traffic management during the Term in accordance with the approved Traffic Management Plan. 6.5.3 Developer shall implement the Traffic Management Plan to promote safe and efficient operation of the Project and Related Transportation Facilities at all times during the course of any construction or operation of the Project by Developer and during the Utility Adjustment Work. 6.5.4 TxDOT shall have at all times, without obligation or liability to Developer, the right to (a) issue Directive Letters to Developer regarding traffic management and control (with which Developer shall comply), or directly assume traffic management and control, of the Project during any period that the Executive Director determines such action will be in the public interest as a result of an emergency or natural disaster; and (b) provide on the Project, via message signs or other means consistent with Good Industry Practice, traveler and driver information, and other public information (e.g., amber alerts).

  • STATEWIDE CONTRACT MANAGEMENT SYSTEM If the maximum amount payable to Contractor under this Contract is $100,000 or greater, either on the Effective Date or at any time thereafter, this section shall apply. Contractor agrees to be governed by and comply with the provisions of §§▇▇-▇▇▇-▇▇▇, ▇▇-▇▇▇-▇▇▇, ▇▇-▇▇▇-▇▇▇, and ▇▇- ▇▇▇-▇▇▇, C.R.S. regarding the monitoring of vendor performance and the reporting of contract information in the State’s contract management system (“Contract Management System” or “CMS”). Contractor’s performance shall be subject to evaluation and review in accordance with the terms and conditions of this Contract, Colorado statutes governing CMS, and State Fiscal Rules and State Controller policies.