WORKDAY/DUTIES Sample Clauses

WORKDAY/DUTIES. A. When an employee is required to fill out a time sheet, a copy of that time sheet will be kept by the employee.
WORKDAY/DUTIES. A. When an employee is required to fill out a time sheet, a copy of that time sheet will be kept by the employee. B. Except in emergency situations, field trip bus drivers shall have rooms separate from sponsor and students. Lodging and food expenses will be paid by the District.
WORKDAY/DUTIES. 1) Substitute teachers shall follow the lesson plans supplied by the classroom teacher and/ or modified by direction of the principal. Where the lesson plans are inadequate, or the materials, facilities, or training needed (e.g., computer lab instructions) are not available, the substitute teacher shall contact the principal for direction. 2) Substitute teachers shall perform the required supervisory duty assigned to the regular teacher for the day, unless the substitute teacher is not informed of the existence of that duty by the office or specified in the teacher's lesson plans. 3) Substitute teachers shall follow the prescribed disciplinary procedures of the District and the school site, and the disciplinary procedures specified by the classroom teacher. Where no disciplinary procedures are specified by the classroom teacher, the substitute teacher shall mirror the apparent standards of the classroom subject to the prescribed disciplinary standards of the district and the school site. 4) Substitute teachers shall have the right to request support from school site administration regarding disruptive students. The removal of disruptive student from the classroom is subject to the provisions of the Education Code. In involving the removal of a student, the substitute teacher shall be required to submit any report regarding the incident required by the District to the principal, unless such requirements are waived by the principal. In waived cases, the substitute teacher shall report the incident in a note to the regular teacher. 5) No substitute teacher shall engage in any personal activities, including use of computers for personal reasons, telephone or cell phone use, except during break times listed in section lA, and only in a manner conforming to school site or District policy as it applies to regular teachers.

Related to WORKDAY/DUTIES

  • Extra Duties The Trustee shall be entitled to refuse to approve any Substituted Obligor if, pursuant to the law of the jurisdiction of incorporation of the Substituted Obligor, the assumption by the Substituted Obligor of its obligations hereunder imposes responsibilities on the Trustee over and above those which have been assumed under this Trust Deed.

  • Typical Duties Measures distance points from reference points and marks guidelines on working surface to lay out work. • Determines vertical and horizontal alignment of courses using ▇▇▇▇▇ ▇▇▇, gauge line (tightly stretched cord) and level. • Spreads soft layer of mortar that serves as base and binder for brick or block using trowel. • Breaks or cut bricks or blocks to size, using power or hand tools. • Shapes stone preparatory to setting, using a chisel hammer and other shaping tools. • Applies mortar to end of brick or block and positions same in mortar bed. • Spreads mortar over stone and foundation with trowel and sets stone in place by hand or with aid of a crane. • Removes excess mortar from face using trowel. • Taps brick or block with trowel to level, align and embed in mortar, allowing for specified thickness of joint. • Aligns stone with plumb line and finishes joints between stone with a pointing trowel. • Fastens brick, block, or terra cotta veneer to face of buildings or structures with appropriate ties embedded in mortar between units or in anchor holes in units. • Grouts, insulates, and places all reinforcing rods, anchors, and flashing in masonry walls. • Lays refractory brick, block, and insulation in place by spreading, dipping, or spraying materials to build furnaces, line boilers or like fire resistant structures. • Finishes mortar between brick and block with pointing tool or trowel. • Points, cleans, caulks and waterproofs masonry. • Cleans excess mortar or grout from surface of stone using sponge, brush, water, or acid. Brick Trowel, Pointing trowel, Brick Hammer, 2’’& 4’’ Levels, Standard Square, Speed Square, Sliding T Bevel, Braided Masonry Line, Line pins & Line Blocks, Standard Tape Measure, Brick Spacing & Modular tapes, Gauge Rod, Tuck Pointers. APPENDIX A CLASSIFICATIONS, WAGES & BENEFITS UNION BASE RATE CREDIT UNION PROVISION (See Note b) PENSION FUND HEALTH & WELFARE APPREN- TICESHIP FUND ANNUITY (See Note b) CARPENTERS (Effective (06/01/2023 – 05/31/2024) Group I $ 36.55 (a) $ 2.40 $ 5.66 $ 8.00 $ 0.78 $ 0.50 Group II $ 36.98 (a) $ 2.40 $ 5.66 $ 8.00 $ 0.78 $ 0.50 Group III $ 37.22 (a) $ 2.40 $ 5.66 $ 8.00 $ 0.78 $ 0.50 General ▇▇▇▇▇▇▇: To be negotiated between the GF and the Company but will be at a rate no less than 12% per hour over the Journeyman scale of the classification under his/her supervision.

  • Job Duties It is understood by the parties that every incidental duty connected with operations enumerated in job descriptions is not always specifically described and employees may be required to perform other job-related duties not specifically contained in the job description; however, employees required to perform such duties shall be qualified for the work to be performed.

  • Normal Duties (a) Faculty members are accountable for 10 months of the year. The 10 months accountable time includes such activities as teaching, the counselling of students, curriculum/program development, professional development and participation on a variety of educational committees. (b) At least one month before the commencement of any accountable time longer than four consecutive days, and covering activities other than teaching or professional development the faculty member will submit for approval to the appropriate administrator an activity plan for this period. Approval will not be unreasonably withheld. On an annual basis, the faculty member will submit to the appropriate administrator a written report of their accountable time activities.

  • General Duties and Responsibilities 1. Responsibilities under the General Conditions of the Contract for Construction: In addition to the responsibilities herein set forth, Consulting Engineer/Architect agrees to be responsible for those matters identified in the General Conditions as being responsibilities of the Consulting Engineer/Architect. Consulting Engineer/Architect specifically acknowledges receipt of a copy of the General Conditions and acceptance of the responsibilities as set forth therein.