▇▇▇▇▇▇ and Plattsburgh Substation System Upgrade Facilities Sample Clauses

▇▇▇▇▇▇ and Plattsburgh Substation System Upgrade Facilities. The ▇▇▇▇▇▇ Substation and Plattsburgh Substation SUFs will be constructed as described in this Section II.B. and with respect to the ▇▇▇▇▇▇ Substation, as shown on drawings 070506-EE-1 and 070506-PL-1 attached to this Appendix A as Figures 3 and 4, respectively.
▇▇▇▇▇▇ and Plattsburgh Substation System Upgrade Facilities. The ▇▇▇▇▇▇ Substation and Plattsburgh Substation SUFs will be constructed as described in this Section II.B. and with respect to the ▇▇▇▇▇▇ Substation, as shown on drawings 070506-EE-1 and 070506-PL-1 attached to this Appendix A as Figures 3 and 4, respectively. P rotection System Changes at Transmission Owner’s ▇▇▇▇▇▇ Substation for the MWP-2 Line The existing MWP-2 line primary protection is a permissive overreaching transfer trip (POTT) system with unblock logic, using a numerical relay in conjunction with audio tone equipment over single side band power line carrier channels. The existing MWP-2 line secondary protection utilizes electromechanical relays to provide backup distance protection. The primary and secondary protection will not essentially change, however the existing breaker failure protection at ▇▇▇▇▇▇ will be modified to trip the ▇▇▇▇ Substation line breakers remotely. To accomplish this scheme two Direct Transfer Trips (DTTs) will be required. The first DTT- 1/MWP-2 equipment required at ▇▇▇▇▇▇ will include: - One FSK PLC Transmitter - One phase C wave Trap - One Phase C Coupling Capacitor Voltage Transformer (CCVT) - One phase C Line Tuner The second DTT-2/MWP-2 equipment will utilize audiotone equipment over the ▇▇▇▇/▇▇▇▇▇▇ microwave communication link described in the Microwave System description.
▇▇▇▇▇▇ and Plattsburgh Substation System Upgrade Facilities. The ▇▇▇▇▇▇ Substation and Plattsburgh Substation SUFs will be constructed as described in this Section II.B. and with respect to the ▇▇▇▇▇▇ Substation, as shown on drawings 070506-EE-1 and 070506-PL-1 attached to this Appendix A as Figures 3 and 4, respectively. The existing MWP-2 line primary protection is a permissive overreaching transfer trip (POTT) system with unblock logic, using a numerical relay in conjunction with audio tone equipment over single side band power line carrier channels. The existing MWP-2 line secondary protection utilizes electromechanical relays to provide backup distance protection. The primary and secondary protection will not essentially change, however the existing breaker failure protection at ▇▇▇▇▇▇ will be modified to trip the ▇▇▇▇ Substation line breakers remotely. To accomplish this scheme two Direct Transfer Trips (DTTs) will be required. The first DTT- 1/MWP-2 equipment required at ▇▇▇▇▇▇ will include: - One FSK PLC Transmitter - One phase C wave Trap - One Phase C Coupling Capacitor Voltage Transformer (CCVT) - One phase C Line Tuner The second DTT-2/MWP-2 equipment will utilize audiotone equipment over the ▇▇▇▇/▇▇▇▇▇▇ microwave communication link described in the Microwave System description.

Related to ▇▇▇▇▇▇ and Plattsburgh Substation System Upgrade Facilities

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.