▇▇▇▇▇▇▇▇ and Utilities Clause Samples

▇▇▇▇▇▇▇▇ and Utilities. Landlord shall furnish the following services: (a) air conditioning and heating in season Monday through Friday from 8:00 a.m. to 6:00 p.m., and upon Tenant’s request, Saturdays from 8:00 a.m. to 12:00 p.m., Legal Holidays excluded; at other times, air conditioning and heating will be furnished at the then Building standard charge (payable by Tenant to Landlord on written demand by Landlord) and on then Building standard terms relating to advance notice, minimum hours, minimum zones, and other matters; (b) janitorial and general cleaning service on Business Days; (c) passenger elevator service from the Building’s lobby to the Premises; (d) common restroom facilities and necessary lavatory supplies, including cold running water; and (e) electricity for the purposes of lighting and general office equipment use in amounts consistent with Building standard electrical capacities for the Premises (excluding electricity for separately metered equipment exclusively serving the Premises, such as supplemental HVAC units, the costs for which shall be paid by Tenant to Landlord upon receipt of an invoice from Landlord). Landlord shall have the right to select the Building’s electric service provider and to switch providers at any time. Tenant’s use of electrical, HVAC or other services furnished by Landlord shall not exceed, either in voltage, rated capacity, use, or overall load, the level of use which Landlord deems to be standard for the Building. Tenant shall pay all costs associated with any such additional utility or service usage, including the installation of separate meters or sub-meters. In no event shall Landlord be liable for damages resulting from the failure to furnish any service, and any interruption or failure shall in no manner entitle Tenant to any remedies including abatement of Rent. If at any time during the Lease Term the Building has any type of access control system for the Parking Areas or the Building, Landlord shall furnish Tenant, at Landlord’s cost and expense, a number of access cards equal to the number of occupants of the Premises at the time such system is installed (the allocation of access cards for Parking Areas will coincide with the parking spaces allocated to Tenant under this Lease, if any). Any replacement cards shall be purchased from Landlord by Tenant at the then Building standard charge.
▇▇▇▇▇▇▇▇ and Utilities 

Related to ▇▇▇▇▇▇▇▇ and Utilities

  • Services and Utilities 5.1 Con Edison shall, subject to the terms and conditions of a separate License Agreement and/or amendment to the Easement Grant, in a form acceptable to Con Edison in its sole discretion, allow the Power Authority to use and occupy certain land at the Con Edison Lands, as preliminarily shown on the Survey, attached hereto as Exhibit E, as required to permit subsurface and/or aerial rights for telecommunications facilities, including phone lines and communication lines, water lines, for potable water protection, two (2) 27 kV feeder(s) for light and power, which shall be owned by Power Authority from the Y connection of the Con Edison System to the Astoria Annex Substation, power supply from the Power Authority’s transformers to the PURS, and the extension of dielectric oil cooling lines for the Q35L & Q35M Transmission Lines. In obtaining the light and power for the Facility, Power Authority shall obtain and pay for unbundled delivery service from Con Edison. Con Edison shall provide the unbundled delivery service to the Power Authority under Con Edison’s Delivery Service Rate Schedule, PASNY No. 4, as it may be revised or superseded from time to time. The charges for the Con Edison delivery services referenced herein shall be based on quantities of electricity that are delivered to the Facility and that are metered at the revenue meters. All such utility/services facilities shall be owned by the Power Authority and shall be maintained by Con Edison pursuant to the terms and conditions of this Composite Agreement. 5.2 Prior to the O&M Commencement Date, the Power Authority shall install, at its sole cost and expense, (i) its own water meter at the Astoria Annex Substation, (ii) its own revenue/electric meters for equipment in the Astoria Annex Substation, (iii) its own revenue/electric meter for the PURS and Pressurization Plants at the Power Authority Property associated with Q35L & Q35M Transmission Lines and (iv) at other locations as Con Edison reasonably requests for the Facility. On or before the O&M Commencement Date, ownership of all such revenue meters shall be transferred to Con Edison. The Power Authority shall establish accounts for any services/utilities, including services, specified in Section 5.1 as applicable, in its own name. The Power Authority shall be solely responsible to pay for any and all such services directly to the provider of such services.

  • Taxes and Utilities The Landlord will pay for all charges assessed against the Premises during the term of this Lease for real estate taxes, water, heat, and electricity. In the event that the Tenant installs any equipment resulting in a significant increase in the demand for power or cooling, the Tenant shall pay the additional cost of such power and cooling as an additional monthly rental payment to be determined by the Landlord. The Landlord has made arrangements for a uniform rate structure for each tenant on the Property with a communications and data provider (the word “communications” and the word “data” as used in this Lease shall include any and all telephonic or electronic transmissions from one place to another of written materials or oral communications and/or transmission of data). The Tenant shall be responsible for paying directly to the service provider, when due, such phone and data line installation charges and monthly service charges as well as the actual costs of all calls. In the event that the Tenant elects to move from the Premises to other premises within the Property, the Tenant acknowledges that it will be liable for the foregoing installation charge for each and every such move.

  • New utilities (i) The Contractor shall allow, subject to the permission from the Authority and such conditions as the Authority may specify, access to, and use of the Site for laying telephone lines, water pipes, electricity lines/ cables or other public utilities. Where such access or use causes any financial loss to the Contractor, it may require the user of the Site to pay compensation or damages as per Applicable Laws. For the avoidance of doubt, it is agreed that use of the Site under this Clause 9.3 shall not in any manner relieve the Contractor of its obligation to construct and maintain the Project Highway in accordance with this Agreement and any damage caused by such use shall be restored forthwith at the cost of the Authority. (ii) The Authority may, by notice, require the Contractor to connect any adjoining road to the Project Highway, and the connecting portion thereof falling within the Site shall be constructed by the Contractor at the Authority’s cost in accordance with Article 10. (iii) The Authority may by notice require the Contractor to connect, through a paved road, any adjoining service station, hotel, motel or any other public facility or amenity to the Project Highway, whereupon the connecting portion thereof that falls within the Site shall be constructed by the Contractor on payment of the cost. The cost to be paid by the Authority to the Contractor shall be determined by the Authority’s Engineer. For the avoidance of doubt, in the event such road is to be constructed for the benefit of any entity, the Authority may require such entity to make an advance deposit with the Contractor or the Authority, as the case may be, of an amount equal to the estimated cost as determined by the Authority’s Engineer and such advance shall be adjusted against the cost of construction as determined by the Authority’s Engineer hereunder. (iv) In the event construction of any Works is affected by a new utility or works undertaken in accordance with this Clause 9.3, the Contractor shall be entitled to a reasonable Time Extension as determined by the Authority’s Engineer.

  • COMMON UTILITIES Expenses for serving/supply of common facilities and utilities and all charges incidental thereto.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call ▇-▇▇▇-▇▇▇-▇▇▇▇). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.