▇▇▇▇▇▇▇▇’▇ Method Clause Samples

▇▇▇▇▇▇▇▇’▇ Method. ‌ The heritability method due to Falconer (▇▇▇▇▇▇▇▇ and ▇▇▇▇▇▇, 1996) is based on moment matching of intraclass correlation coefficients between MZ twins (rMZ) and DZ twins (rDZ): + + E [rMZ] = A + C , E [rDZ] = 2 . 1 A + C A + C + E Solving for narrow sense heritability (2.3), these equations give the Falconer’s her- itability estimator: h = 2 × (r − r ). (3.8) F MZ DZ This method is the earliest and simplest way to estimate the heritability (▇▇▇▇▇▇▇▇ and ▇▇▇▇▇▇, 1996), but earlier work has shown that it performs worse than the likelihood-based methods (▇▇▇▇▇▇▇ et al., 2009).

Related to ▇▇▇▇▇▇▇▇’▇ Method

  • Test method This test is intended to demonstrate the immunity of the vehicle electronic systems. The vehicle shall be subject to electromagnetic fields as described in this annex. The vehicle shall be monitored during the tests. If not otherwise stated in this annex the test shall be performed according to ISO 11451-2.

  • Billing Method 2.6.1 To receive payment for services rendered pursuant to this contract the Contractor shall submit a fully completed invoice for work previously performed to: 2.6.2 At a minimum, the invoice shall detail the following information: 2.6.2.1 Unique invoice number; 2.6.2.2 Contractor’s name, address, and telephone number; 2.6.2.3 Date of invoice and/or billing period; 2.6.2.4 Applicable Contract No.;

  • Allocation Method (Choose one of a. or b.): a. [ ] All the same. Using the same allocation method as applies to the Signatory Employer under this Election 28. b. [ ] At least one different. Under the following allocation method(s): .

  • Payment Method Payment shall be made by the Contractor to the Subcontractor as follows: (choose one) ☐ - Immediately upon completion of the Services to the satisfaction of the Contractor. ☐ - Within ____ business days after completion of the Services to the satisfaction of the Contractor. ☐ - Shall be paid on a ☐ weekly ☐ monthly ☐ quarterly ☐ other ______________________ basis. If the Subcontractor completes the Services to the satisfaction of the Contractor, before the full amount or balance has been fully paid, any remaining amount shall be payable immediately. ☐ - Other: ________________________________________________________

  • Measurement method An isolation resistance test instrument is connected between the live parts and the electrical chassis. The isolation resistance is subsequently measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in conductively connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those components disconnected.