QUALIFYING RENEWABLE GENERATING INSTALLATION/INTERCONNECTION AGREEMENT (OUTPUT < 50 KW)
Qualifying Renewable Generating Installation/Interconnection Agreement • April 21st, 2022

***One-Line drawings should show the most current drawing(s) available as of the signing of this installation/interconnection agreement. GVEC and Renewable Generator/Owner agree drawing(s) may be updated to meet design changes that occur during construction. Renewable Generator/Owner understands and agrees that any changes that substantially affect the protective or functional requirements required by GVEC will need to be reviewed and accepted in writing by GVEC.