Design Completion definition

Design Completion. Design shall be considered complete upon the Respondentssubmission of approvable plans and specifications to the Department for review.
Design Completion means the completion of the development of a Joint Product as evidenced by the written agreement of the PEC.

Examples of Design Completion in a sentence

  • Planned Preliminary Engineering/NEPA Completion Date: [insert date] [insert date] Planned Final Design Completion Date: [insert date] [insert date] Planned Construction Substantial Completion Date: [insert date] [insert date] Budget: [ If any amounts listed in sections 3–4 of schedule D differ from the budget presented in the application, describe the changes here and provide an explanation of the cause of those changes.

  • The Design Scope of Work shall consist of two phases: Conceptual Development (Up to Mid-Term Design Meeting) and Design Development (up to Design Completion Meeting).

  • At or prior to the Design Completion Meeting described in Exhibit A, Design/Builder shall provide Public Agency with a proposal setting forth a proposed Scope of Construction Work, a proposed Project Fee, and any other information required to be included therein pursuant to Exhibit A (the “Project Proposal”).

  • Contractor shall commence the Design Services within 5 days of receiving the Notice to Proceed (NTP) ("Design Commencement Date"), diligently and continuously prosecute the Design Services until the completion of the Design Services, meet all Interim Dates, and complete the Final Design by the Final Design Completion Date.

  • The Company shall submit monthly progress reports to the Village regarding the Design/Build Work and compliance with the Final Design Completion Date and Project Schedule.

  • Anticipated Design Completion Date: July 30, 2021 or 13 weeks after notice to proceed.

  • Budget Period End Date: See section 28.4 of the General Terms and Conditions Period of Performance End Date: See section 28.5 of the General Terms and Conditions Planned Preliminary Engineering/NEPA Completion Date: [insert date] Planned Final Design Completion Date: [insert date] Planned Construction Substantial Completion Date: [insert date] [Choose the appropriate one of these two alternatives.] [Alternative #1: If the only critical dates are completion dates, then use the following:] None.

  • The project is in the design phase and is scheduled to meet the following milestones: • Final Design Completion – November 30, 2021 • Construction Award – February 28, 2022 • Construction Complete – March 31, 2023 The project performance measure will be the amount of impervious surface area treated with GSI, approximately 15,000 square feet.

  • KEY TARGET MILESTONES: Analysis and Design Start Date: Business Requirements Specification Completion Date: Functional Design Completion Date Functional Design Review Date • Customer shall execute this DSOW on or before ; should Customer fail to, at CSG’s option, this DSOW may be deemed null and void in its entirety.

  • The date of Design Completion is as determined in the Owner’s Scope, Budget and Schedule Confirmation form, incorporated herein by reference.

Related to Design Completion

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.

  • Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

  • Testson Completion means the tests which are specified in the Contractor agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.