The actual power exchange will be implemented using a Dynamic Schedule based on current PJM congestion conditions (LMP).
The Dynamic Schedule will be limited to the point to point reservation.
DEP and PJM will provide each other the necessary information to implement the Dynamic Schedule.
DEP will increase/decrease generation to support a Dynamic Schedule change with a 50 MW maximum (or less if DEP generation cannot move 50 MW) every five minutes consistent with the PJM LMP value compared to the DEP cost and the ability of the DEP system to modify generation output.
Coordination of actual power flow across the DEP/PJM interface to reduce congestion will be accomplished by implementing a Dynamic Schedule between CPLE and PJM to move power across the interface.
A DTC award that involves a Dynamic Schedule, is scheduled using a Type-Dynamic e-Tag.
To make this determination, PJM will compare the real-time, 5-minute incremental cost for the DEP generation fleet to increase or decrease the applicable 5-minute real-time LMP as calculated by PJM, and the current and previous values of the DEP Dynamic Schedule and apply the explicit metrics detailed below for this determination.
If the LMP is less than the incremental costs for DEP generation to decrease, PJM will verify that the decrease in the 5-minute value of the Dynamic Schedule for the period where the LMP is less than the DEP cost to decrease generation is at least 90% of the real-time capability for DEP generation to decrease.
The make-whole evaluation shall be conducted in the following manner: For each hour of the operating day, PJM will determine whether the DEP Dynamic Schedule is following PJM pricing signals and, therefore, whether that hour should be included in the daily make-whole calculations.
PEC and PJM will provide each other the necessary information to implement the Dynamic Schedule.