Final System Acceptance definition

Final System Acceptance means the project milestone when the County accepts as complete the project scope of work for its individual contract with the Successful Offeror. The project scope of work includes, without limitation: Detailed Design Review, System Factory Staging, Site Development and System Integration Services, Regulatory Work, Training, System Acceptance Testing, System Cutover, Documentation, Equipment Removal, and Punchlist Resolution, as each of those terms is used within section 2.2 of the RFP (System Specifications).
Final System Acceptance means completion of the Final Acceptance Period, testing and written acceptance by the Authority as provided in Section 7.3 hereof.
Final System Acceptance means acceptance of the System.

Examples of Final System Acceptance in a sentence

  • Contractor represents and warrants that no Deliverable, when installed, will impair or degrade the performance of any existing system, during the period from installation until Final System Acceptance.

  • Unless otherwise stated in the Software License Agreement [insert cross reference if applicable], Contractor warrants the Contractor Software for one (1) year from the date of Final System Acceptance in accordance with the terms of the Software License Agreement and the provisions of Section 5.

  • The warranty period shall be one year from the date Final System Acceptance.

  • Additionally, Contractor shall warrant its Services and software customizations for a period of one (1) year after Final System Acceptance [insert cross reference where defined if applicable] (“Warranty Period”).

  • The following standards of performance are to be met during the Final System Acceptance Period in order for acceptance to take place.


More Definitions of Final System Acceptance

Final System Acceptance shall have the meaning ascribed thereto in the Construction Contract.
Final System Acceptance or “FSA” has the meaning set forth in Article 10.4.
Final System Acceptance means acceptance of the System Upgrade as a whole, as set forth in Article 32 hereof.
Final System Acceptance means that the system including all system components, equipment, software, connections, and interfaces, and Third Party Software : (a) has met all of the acceptance criteria for functionality and performance when fully integrated with County systems and networks, for the system and any products requiring Acceptance Testing, that the system has successfully completed the Reliability Acceptance Test and the County has provided a Certificate of Final System Acceptance to Contractor; and (b) all products perform in
Final System Acceptance means that date on which the System has 29 successfully completed the ninety (90) day Final System Acceptance Test 30 period as more fully defined in Exhibit A, Statement of Work.
Final System Acceptance means when Contractor: (i) completes the Acceptance Tests on the System in accordance with the Acceptance Test Plan, and related punch-list items to the satisfaction of the County; (ii) completes final installation of the System and related punch-list items to the satisfaction of the County; (iii) completes installation of the subscriber equipment to the satisfaction of the County; (iv) completes all training required by the Contract Documents; (v) provides the County with all deliverables (e.g., as-built documentation, etc.) required by the
Final System Acceptance means final WSDOT approval of the implemented New System. The Final System Acceptance shall occur after all regions have been successfully installed, tested, and integrated. The Final System Acceptance shall trigger the commencement of the warranty of New System elements and Contractor payments.