Integration Testing definition
Examples of Integration Testing in a sentence
Registry Operator will provide ICANN (i) confirmation of completion of Integration Testing and (ii) notice of the start date (the “Claims Commencement Date”) and end date for the Claims Period (as defined in the TMCH Requirements) for the TLD, in each case via the customer services portal at ▇▇▇▇://▇▇▇▇▇▇▇.▇▇▇▇▇▇.▇▇▇▇▇.▇▇▇/.
Within fifteen (15) Business Days following the completion of any Acceptance Tests, including any Integration Testing, the party responsible for conducting the tests will prepare and provide to the other party written notice of the completion of the tests.
Data for System Integration Testing ("SIT"), User Acceptance Testing ("UAT"), shall be provided as per the timelines defined in the plan in Annexure D.
Tests include: Functional Bench Testing, First Article Testing, Environmental Qualification Testing (EQT), Integration Testing, Software Compatibility Testing, and any necessary regression testing.
Vendor Developer Visual Studio and Microsoft Test Manager Development During Iteration Integration System Integration Testing confirms that the necessary communications and setup exist to perform Functional Testing and addresses the need to assess whether the system interfaces with other applications or systems without interfering with how they operate.
If the Parties agree that Integration Testing has revealed a Material Defect, the Parties shall document the nature of the Material Defect identified by the Integration Testing.
The test is agreed with each Contracting Body and includes Functional Testing to confirm features/functionality compliance; load testing of the Contracting Body’s Peak Loads; Performance Testing for response times and Integration Testing to ensure that ▇▇▇▇▇▇▇’▇ systems function as expected when accessed via the Contracting Body’s secure network.
If such efforts to remedy the CBOT Defect prove unsuccessful, this cycle shall be repeated until Integration Testing results reveal no CBOT Defects.
The Parties agree that the Data must not be transferred to countries outside the European Economic Area (EEA) for the purpose of Systems Integration Testing (SIT), Qualification and Migration/Transition.
The SI ensures the firmware meets SIT exit criteria and DCC assures this before the firmware is approved for SIT exit DCC, SI User Integration Testing (UIT) DCC defines a UIT window to provide DCC Customers the opportunity to verify the new Comms Hub firmware with their devices and in accordance with their test scenarios.