Operating Constraints definition

Operating Constraints means: the Engineering Access Statement; the Timetable Planning Rules; and the Working Timetable and all appendices to the Working Timetable including the sectional appendices as defined in the Working Timetable and all supplements to the sectional appendices;
Operating Constraints means: the Engineering Access Statement;
Operating Constraints means the operating limits, project operating requirements, and non-power constraints that are the result of implementing Federal Operating Decisions or Prudent Operating Decisions.

Examples of Operating Constraints in a sentence

  • The Train Operator shall use its reasonable endeavours to ensure that any Specification provided in accordance with this Clause 7.1 conforms to the Facility Operating Constraints.

  • Following such monthly meeting, Continental shall make such adjustments to the proposed Final Monthly Schedule as it deems appropriate (subject to Reasonable Operating Constraints), and, not later than three Business Days prior to the beginning of each calendar month, will deliver to Contractor the Final Monthly Schedule.

  • ABP shall use its reasonable endeavours, having regard to the Facility Operating Constraints, the Decision Criteria and its Safety Obligations, to provide such Stabling facilities as are necessary or expedient for or in connection with the provision of the Services.

  • Following such monthly meetings and delivery of the Final Monthly Schedule, however, Continental may make such adjustments to the proposed Final Monthly Schedule as it deems appropriate (subject to Reasonable Operating Constraints).

  • If either party proposes an amendment to this Contract (other than in respect of the matters dealt with by Clause 8, the Service Facility Operating Constraints Change Procedure or Clause 11), it shall notify the other party of the details of the proposed amendment and the Second Level Representatives of the parties shall meet within eight (8) Working Days of such notification to discuss the proposed amendment with a view to reaching agreement regarding it.

  • Other Facility Operating Constraints will be specified in the relevant Method of Work, Standing Instructions and Special Instructions as amended from time to time, or otherwise published by ABP from time to time.

  • Continental shall, in its sole discretion, establish and publish all schedules for the Covered Aircraft, including determining the city-pairs served, frequencies, utilization and timing of scheduled arrivals and departures and charter flights; provided that such schedules shall be subject to Reasonable Operating Constraints.

  • Further details of the Service Facility Operating Constraints are specified in the relevant DB Cargo Safe System of Work and any relevant instructions, as amended from time to time, or otherwise provided to the Access Beneficiary by DB Cargo periodically.

  • Following such delivery of the Final Monthly Schedule, however, United may make such adjustments to such Final Monthly Schedule as it deems appropriate (subject to Reasonable Operating Constraints and Conditions); provided that such adjustments by United shall not require more flight crew resources to operate the Final Monthly Schedule, based on reasonable flight crew requirements, than the flight crew resources that would have been necessary to operate the Initial Proposed Monthly Schedule.

  • Following delivery of the Final Monthly Schedule, however, Frontier may make such adjustments to the proposed Final Monthly Schedule as it deems appropriate (subject to Reasonable Operating Constraints).


More Definitions of Operating Constraints

Operating Constraints means: the CVL Engineering Access Statement;
Operating Constraints means the working timetable in respect of the Rail Terminals prepared by FDRC from time to time, and such other operating constraints as FDRC may notify to the Train Operator from time to time;
Operating Constraints means the constraints that affect the operation of the Network or trains on the Network set out in paragraph 2 of Schedule 2 to this contract;

Related to Operating Constraints

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Limited Resource Constraint means, for the 2017/2018 Delivery Year and for FRR Capacity Plans the 2017/2018 and Delivery Years, for the PJM Region or each LDA for which the Office of the Interconnection is required under Tariff, Attachment DD, section 5.10(a) to establish a separate VRR Curve for a Delivery Year, a limit on the total amount of Unforced Capacity that can be committed as Limited Demand Resources for the 2017/2018 Delivery Year in the PJM Region or in such LDA, calculated as the Limited Demand Resource Reliability Target for the PJM Region or such LDA, respectively, minus the Short Term Resource Procurement Target for the PJM Region or such LDA, respectively.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Environmentally constrained area means the following areas where the physical alteration of the land is in some way restricted, either through regulation, easement, deed restriction or ownership such as: wetlands, floodplains, threatened and endangered species sites or designated habitats, and parks and preserves. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.