Program of Requirements definition
Examples of Program of Requirements in a sentence
If Architect/Engineer prepares the Program of Requirements, then Owner will review the Program of Requirements when completed and then determine whether to proceed with the Project and authorize commencement of Basic Services.
The Owner reserves the right to terminate this Agreement following completion of the Program of Requirements, and shall have no further obligation to Architect/Engineer other than payment for services authorized by Owner and provided by Architect/Engineer prior to such termination in accordance with the terms and conditions of this Agreement.
The Program of Requirements will set forth the Owner’s description of the project scope, preliminary project cost, schedule, criteria for design objectives, characteristics and constraints, space requirements and relationships, site requirements, existing facilities, and desired special components, systems and equipment.
The Program of Requirements or "Program" is the detailed written summary of the requirements of the facility which sets forth the Owner's design objectives, constraints and criteria, including space requirements and relationships, quality levels, flexibility and expandability, special equipment and systems and site requirements, as described in the IPPA.
No deviations from the Program of Requirements shall be allowed without written approval for change, in the form of a Design Phase Change Order executed by the Owner and Design Consultant.
No deviations from the Program of Requirements shall be allowed without written approval for change, in the form of a Design Phase Change Order executed by the Owner and Engineer.
Where existing TSA-controlled space, funding, and infrastructure permit, TSA will equip break rooms under its control in accordance with TSA’s Facility Program of Requirements with vending machines, refrigeration, microwave ovens and running water.
Based on input obtained through the process outlined in the project scope of work, as well as information provided in the Program of Requirements, Stakeholder Interviews, and Public Workshop, the Design-Builder will work to determine the Concept Design.
The PROVIDER will be responsible for facility programming and comprehensive Program of Requirements (POR) development services in conjunction with the construction delivery process as utilized by the A&M System.
Pre-construction Phase Assist in the development of AV requirements and cost for a Program of Requirements.