Requirements Traceability Matrix definition
Examples of Requirements Traceability Matrix in a sentence
SA documentation shall be developed using the Government provided Requirements Traceability Matrix and Government security documentation templates.
If the Monthly Operations and Maintenance Reports or the Key Performance Indicators or its subsequent and corresponding Performance Liquidated Damages shall deviate from one another or require further development to assure that all parties agree to the Key Performance Indicators and Performance Liquidated Damages, the Joint Board Representatives shall include these Deviations or clarifications within the Requirements Traceability Matrix.
The Requirements Traceability Matrix to be inserted by the Buyer of Record after an award has been issued by ▇▇▇▇▇▇▇▇ for the RFP.
Update Relevant Documents Contractor shall update the following artifact as relevant based on the content of this Deliverable: Requirements Traceability Matrix Design Data Marts Contractor shall utilize HSD completed/in-progress BRDs (where available) as a starting point to gather requirements through JAR/JAD sessions for all HSD identified data marts and parameterized queries in accordance with the DS-specific and project-level Requirements Management Plans.
The test cases shall be placed and maintained in Jira with appropriate links to requirements artifacts to support the Requirements Traceability Matrix deliverables.
The SyRS shall include a Requirements Traceability Matrix that demonstrates associations between work products, requirements, PB entries, test/verification events, and operational releases.
June 30, 2017 CMS Enrollment Interface Testing Completion and Initial File Submission CMS.02.2 Updated Requirements Traceability Matrix Updates to the existing CMSEI Requirements Traceability Matrix.
Each program and/or configuration shall be thoroughly documented and updated into the Requirements Traceability Matrix.
Any changes, removals or additional requirements that have been formally approved through the Change Control Process will be updated in the Project Requirements Traceability Matrix.
Data Marts include (Refer to Exhibit D for descriptions and purposes): Member Months Income Support Client Contractor shall update the DS Requirements Traceability Matrix in alignment with the overarching project-level Requirements Traceability Matrix.