Scheduled Date of Completion definition

Scheduled Date of Completion means the date on which the Project is scheduled to deliver Electricity to ...ESCOM at the Delivery Point after completion of all the required tests, and shall be within eighteen months from the date of achievement of financial closure or twenty four months from the date of signing of agreement whichever is later. “State Load Despatch Centre” means the load despatch center of the Corporation located at Bangalore. “State Load Despatch Centre” means the State Load Despatch Centre established as per the Act. “System Constraint” means a condition or situation including the condition of ‘Emergency’ under which the Corporation’s/..ESCOM’s electrical system is not able to evacuate and transmit the generated energy fully or partly from the project due to unforeseen breakdown of the system. “System Constraint” means a condition or situation including the condition of ‘Emergency’ under which the Corporation’s/..ESCOM’s electrical system is not able to evacuate and transmit the generated energy fully or partly from the project due to unforeseen breakdown of the system. “Tariff” means shall have the meaning set forth in Article 5 “Tariff” shall have the meaning set forth in Article 5.1 to 5.3 “Technical Limits” means the limits and constraints described in Schedule 2, relating to the operations, maintenance and despatch of the Project. “Technical Limits” means the limits and constraints described in Schedule 2 “Term” means the term of the agreement as defined in Clause 9.1. “Term” means the term of the agreement as defined in Clause 9.1 “Unit” means one set of turbine-generator and auxiliary equipment and facilities forming part of the Project “Unit” means one set of turbine-generator and auxiliary equipment and facilities forming part of the Project. “Voltage of Delivery” means the voltage at which the Electricity generated by the Project is required to be delivered to ESCOM and shall be ……KV. “Voltage of Delivery” means the voltage at which the Electricity generated by the Project is required to be delivered to ESCOM and shall be …KV.
Scheduled Date of Completion means the date on which the last Unit of the Project is scheduled to deliver Electricity to ..ESCOM at the Delivery Point after completion of all the required tests, and shall be within 24 months from the date of
Scheduled Date of Completion means the date on which the Project is scheduled to deliver Electricity to Corporation at the Delivery Point after completion of all the required tests, and shall be within one and half years from the date of achievement of Financial Closure.

Examples of Scheduled Date of Completion in a sentence

  • The Company shall complete the construction of all the Units of the Project before the Scheduled Date of Completion.

  • Provided that if there is any new imposition or increase of any development charges after the expiry of the Scheduled Date of Completion of the Project as per registration with the Authority as per the Act, the same shall not be charged from the Allottee.

  • The Scheduled Date of Completion of the work for the Coconino Estates Improvements Phase 1 agreement term of 900-calendar days.

  • Any change in the Contract Sum or the Scheduled Date of Completion pursuant to a Field Order Request shall be determined as provided below and set forth in writing by FORA and Contractor within thirty (30) days after completion of that portion of the Work covered by such Field Order Request.

  • When by an Act of God or Force Majeure, except as provided in Clause 27.3 and 27.5, continuation of the works becomes impossible for a period that delays the Scheduled Date of Completion of the Project by more than 180 consecutive Days or 270 cumulative Days, the Contractor may choose not to execute them.


More Definitions of Scheduled Date of Completion

Scheduled Date of Completion means the date on which the Project is scheduled to deliver Electricity to ESCOM at the Delivery Point after completion of all the
Scheduled Date of Completion means the date on which the last Unit of the Project is scheduled to deliver firm power to DISCOM at the Delivery Point after completion of the entire required tests.
Scheduled Date of Completion means the date on which the last Unit of the Project is scheduled to deliver Electricity to UPCL at the Delivery Point after completion of all the required tests, and shall be as follows: Within a period of 18 months from the date of achieving the “Financial closurein respect of Wind power projects, Co-generation and Biomass/Biogas projects. Within a period of 24 months from the date of achieving the “Financial closure” in respect of small hydro projects upto 5 MW. Within a period of 36 months from the date of achieving the “Financial closure” in respect of small hydro projects above 5 MW and upto 25MW.
Scheduled Date of Completion means the date on which the last Unit of the Project is scheduled to deliver Electricity to Corporation at the Delivery Point after completion of all the required test. “STU” State Transmission Utility which in this case is HVPN.
Scheduled Date of Completion means the date on which the Project is scheduled to deliver contracted energy to HPPC at the Delivery Point after completion of all the required tests.
Scheduled Date of Completion means the date of completion referred to in Clause 9.1;
Scheduled Date of Completion means the date on which the Project is scheduled to deliver contracted energy to HPPC at the Delivery Point after completion of all the required tests i.e upto one year from the date of signing of PPA.