Switch Site Ready Date means the date specified by the Owner as the date on which the Switch Site will in fact be ready for MSC installation as communicated to the Vendor by the Owner in the Owner's Switch Site Notice to the Vendor, (ii) the "Switch Site Notice Date" will mean, as to any Switch Site Notice, the date on which such notice was delivered to the Vendor by the Owner and (iii) the "Switch Site Notice" will mean the notice provided to the Vendor by the Owner in sufficient detail to describe the Switch Site so that the Vendor may reasonably engineer the layout of the MSC configuration specifically for such Switch Site. Nothing contained herein will in any way limit the Vendor's obligation pursuant to the terms of this Contract to do the MSC engineering and the RF Engineering in accordance with the terms of this Contract. Pursuant to this subsection 2.6(d) in no event will the Owner provide the Vendor the Switch Site Notice more than sixty (60) days later than the date the Owner delivers the Vendor the Build Notice pursuant to subsection 2.7(a).
Switch Site Ready Date has the meaning ascribed thereto in sub- section 2.6(d).

Examples of Switch Site Ready Date in a sentence

  • Such forecasts will, to the extent applicable, include, but not be limited to, the Owner's Site Acquisition, Switch Site Ready Date, Network Interconnection and Microwave Relocation progress to such date.

Related to Switch Site Ready Date

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Installation Date means the date specified in the Statement of Work by which the Contractor must have the ordered Equipment ready (certified) for use by the State.

  • Installation Site means the site at which the Product is originally installed.

  • Installation Services means all those services ancillary to the supply of the Plant for the Facilities, to be provided by the Contractor under the Contract, such as transportation and provision of marine or other similar insurance, inspection, expediting, site preparation works (including the provision and use of Contractor's Equipment and the supply of all construction materials required), installation, testing, pre- commissioning, commissioning, operations, maintenance, the provision of operations and maintenance manuals, training, etc…as the case may require.