Systems Connection Point definition

Systems Connection Point has the meaning given to that term in the BSC.
Systems Connection Point has the meaning given to that term in the BSC. Theft In Conveyance means the abstraction of electricity (regardless of where such abstraction takes place) for use otherwise than at a Premises for which there is a Metering Point or Metering System that is Registered by a User. Theft of Electricity includes (but is not limited to) Theft In Conveyance, the circumstances described in paragraph 4 of schedule 6 to the Act, and the circumstances described in paragraph 11 of schedule 7 to the Act. Theft Risk Assessment Service Arrangements means the arrangements for a theft risk assessment service and other related measures that the Supplier Parties are obliged to maintain pursuant to the Supplier Licences (but excluding the Energy Theft Tip-Off Service), which service is, from Energy Theft Consolidation, being moved from this Agreement to the Retail Energy Code. Third Party Electricity Supplier means, in relation to a Metering Point, the Supplier Party Registered for a second Metering Point where the two Metering Points have Proximate Metering Equipment (as further described in Clause 52M.2 or 52Q.2, as applicable).
Systems Connection Point. : means a point of connection (whether consisting of one or

Examples of Systems Connection Point in a sentence

  • The Company shall be entitled to collect data from, inspect, test and (if necessary) correct any metering equipment installed and maintained pursuant to Clause 42.5 (or, where the Connection Point is a Systems Connection Point, require the User to do so).


More Definitions of Systems Connection Point

Systems Connection Point the Connected Systems Points collectively; and
Systems Connection Point. : means a point of connection (whether consisting of one or more circuits) between two or more Systems excluding:(a) a point of connection between Distribution Systems in the same GSP Group; and(b) a point of connection between Offshore Transmission System User Assets and the Transmission System; "TC (IEA) Energy Account": means an Energy Account of the Transmission Company held pursuant to Section A1.4.3; "TC (Non-IEA) Energy Account": means an Energy Account of the Transmission Company held pursuant to Section A1.4.1(c); "TDC Chairman": has the meaning given to that term in Section W2.5.1; "TDC Member": has the meaning given to that term in Section W2.3.1; "TDC Terms of Reference": has the meaning given to that term in Section W2.3.3; "Technical Assurance Agent" or"TAA": means, in relation to CVA Metering Systems or SVA Metering Systems (as the case may be), the BSC Agent for Technical Assurance in accordance with Section E; "Teleswitch Agent": means the BSC Agent for Teleswitch Monitoring in accordance with Section E; "Teleswitch Group": is defined in Annex X-2; "Tender Committee": has the meaning given to that term in Section E2.7.2; "Tender Framework Statement": has the meaning given to that term in Section E2.7.1; "Third Party Claim": has the meaning given to that term in Section H7.2.3; "Third Party Generating Plant": means Exemptable Generating Plant for whose Exports a Party, not being the person (acting in that capacity) who generates electricity at such Generating Plant, has for the time being elected to be responsible in accordance with Section K1.2.2(a)(ii)(2); "Third Party Generator": means the person (whether or not a Party) who generates electricity at Third Party Generating Plant, in that capacity; "Time Standard": has the meaning given to that term in Section O2.2.1; "Timetabled Reconciliation Settlement Run": has the meaning given to that term in Section U2.3; "Timetabled Reconciliation Volume Allocation Run": has the meaning given to that term in Section U.2.3;

Related to Systems Connection Point

  • Connection Point means an exit point or an entry point or a bidirectional point identified or to be identified as such in an access contract.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.