Technical Test definition

Technical Test means such test as the Council may prescribe to assess the mechanical fitness and suitability of the vehicle.
Technical Test. Corporate: EWF PIP LFR TILE TURF Other Validator: Participant Rep: Date: Date: Program Required Documentation Yes No N/A Is current signed License Agreement on file? Approval date: Is ▇▇▇▇▇ Procedural Guide on file? Revision date: ASTM F1292/ASTM F2075/ASTM F3012/ASTM F3313, latest revisions? (Recommended) Certificates of insurance? TÜV SÜD America? ▇▇▇▇▇? Amount: Expiration Date: Is ▇▇▇▇▇ logo(s) being used properly? (Review all usages of logo(s) to Appendix B) ❑ Are current test results on file for all certified products? ❑ ❑ Comments: Control Assurance Program Yes No N/A Is participant ISO 9000 certified? Certifying body: Effective dates: Does Participant have written control assurance manual? Last Revision/Approval date: (Required annual review and approval) Does manual include: Procedure to process customer orders? Procedure for inspection of incoming raw materials? Procedure for manufacturing product? (if applicable) Procedure for the inspection of finished product, or final approval of installation? Procedure for preventative maintenance (if applicable) Procedure for documenting and tracking customer complaints, and applicable forms? Procedure for documenting internal corrective actions, and applicable forms? Procedure for handling nonconforming products? Procedure for handling, storage, packaging and delivery? (as applicable) Method to track origin of shipment? (i.e. manufacturing location, raw materials)? Review examples (2) of process and document method below. (Include invoice or record number) Procedure for contract manufacturer/supplier approval and follow-up? Employee training records (if applicable)? ❑ ❑ ❑ Comments:

Examples of Technical Test in a sentence

  • Contractor shall provide a draft Integrated Technical Test Plan on or before the 45th Calendar Day following the Services Commencement Date.

  • Contractor shall provide a Final Integrated Technical Test Plan on or before the 75th Calendar Day following the Services Commencement Date.

  • The prospective ▇▇▇▇▇▇ Technical Test and Evaluation Contractor must obtain a SECRET clearance with Special Access Program (SAP).

  • Collect data based on PM/PdM requests for information that supports ▇▇▇▇▇▇, ▇▇▇▇▇▇▇, Paladin PIM, and M113/AMPV requirements analysts, Technical Test and Evaluation SMEs, and MCoE / other TRADOC Centers of Excellence doctrinal and training development experts in order to provide a holistic review of documentation from a holistic DOTMLPF perspective.

  • Contractor shall develop an Integrated Technical Test Plan to test connectivity and data flow between legacy MES applications and the MES claims module currently scheduled to be transitioned by September 1, 2023.

  • When the approved by HHSC, Contractor will execute the Integrated Technical Test Plan and provide to HHSC the test results.

  • These include the Emtec Aptitude Test, Emtec Programming Test, and Emtec Technical Test  Each correct answer adds 2 ▇▇▇▇(s); each wrong answer subtracts 1mark(s).

Related to Technical Test

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Acceptance Tests means such tests as may be conducted in accordance with Section 9.1 and a Statement of Work to determine whether the Software meets the requirements of this Contract and the Documentation.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).