AIL System Deficiencies. In the event that Acceptance Testing demonstrates that the AIL System does not provide the functionality and performance required by AIL in the SOW, notwithstanding that such deficiency is not the result of a defect in the Terminals, the applicable provisions of the SOW or the Terminal design documentation, Contractor shall cooperate with AIL to implement, on an accelerated basis, adjustments and modifications to the design and production of the Terminals to achieve the required functionality and performance. Such actions may include retrofits, accelerated second-generation design and production and such other means as may be required to produce the required functionality and performance in the most expeditious and cost-effective manner. The Parties will agree to a reasonable basis for compensating Contractor for performance of such activities.
AIL System Deficiencies. In the event that Acceptance Testing of the Gateway Terminal (including Prototype Gateway Terminal and the Preproduction Gateway Terminal) with the AIL System demonstrates that the AIL System does not provide the functionality and performance required by AIL in the SOW, notwithstanding that such deficiency is not the result of a Defect in the Gateway Terminals, the applicable provisions of the SOW or the Gateway Terminal design documentation, Contractor shall cooperate with AIL to implement, on an accelerated basis, adjustments and modifications to the design and production of the Gateway Terminals to achieve the required functionality and performance. Such actions may include retrofits, accelerated second-generation design and production and such other means as may be required to produce the required functionality and performance in the most expeditious and cost-effective manner. The Parties will agree to a reasonable basis for compensating Contractor for performance of such activities.

Related to AIL System Deficiencies

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2

  • Electrical Items All electrical items purchased under this Grant Agreement/Contract or used in the performance of approved and eligible grant-funded activities must meet all applicable Occupational Safety and Health Administration (OSHA) standards and regulations, and bear the appropriate listing from Underwriters Laboratory (UL), Factory Mutual Resource Corporation (FMRC), or National Electrical Manufacturers Association (NEMA).

  • Maintenance Work Landlord reserves the right from time to time, but subject to payment by and/or reimbursement from Tenant as otherwise provided herein: (i) to install, use, maintain, repair, replace, relocate and control for service to the Premises and/or other parts of the Project pipes, ducts, conduits, wires, cabling, appurtenant fixtures, equipment spaces and mechanical systems, wherever located in the Premises or the Project, (ii) to alter, close or relocate any facility in the Premises or the common areas or otherwise conduct any of the above activities for the purpose of complying with a general plan for fire/life safety for the Project or otherwise, and (iii) to comply with any federal, state or local law, rule or order. Landlord shall attempt to perform any such work with the least inconvenience to Tenant as is reasonably practicable, but in no event shall Tenant be permitted to withhold or reduce Basic Rental or other charges due hereunder as a result of same, make any claim for constructive eviction or otherwise make any claim against Landlord for interruption or interference with Tenant's business and/or operations.

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.