At Final Completion Clause Samples

At Final Completion the Contractor shall provide the fully As-Built Documents to the City. These As-Built Documents will become the permanent property of City at Final Completion. If the As-Built Documents are prepared on a computer, then the revised computer files shall also be provided to City in the file format specified by City.
At Final Completion the Contractor shall provide a notarized certification to Owner that all equipment and materials used in fulfillment of its Contract responsibilities are non-Asbestos Containing Building Materials (ACBM). This certification must be provided no later than the Contractor’s application for Final Payment.
At Final Completion the Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. 295.34, par. c.1 that no ACBM was used during construction of the Project.
At Final Completion. CONTRACTOR shall provide a listing of OWNER’s surplus material. CONTRACTOR shall return all excess pipe and material to OWNER’s coating contractor’s facility or other location to be determined by OWNER, provided the other location is no further than the distance from the work site to the initial point of receipt. 16.7 CONTRACTOR shall not install any materials into the Project, regardless of origin, which are defective, damaged, previously used or do not have applicable mill and/or test certificates, etc. unless authorized to do so by OWNER in writing. CONTRACTOR shall keep a receiving log during the term of the Agreement. This log shall contain a description and count of the materials that were received, the condition of the material at time of receipt, the date received and the name and position of the person who received the materials. 16.8 CONTRACTOR shall be required to ensure that there is suitable access and load out facilities to accommodate CONTRACTOR’s proposed pipe haul equipment. CONTRACTOR shall bear the responsibility for access and/or fees for its equipment, if applicable. CONTRACTOR shall bear the responsibility of timely communication with coating contractor’s personnel to coordinate the logistics of pipe load-out. CONTRACTOR shall be responsible for tie-down design, stanchion design and transportation of the OWNER supplied pipe. Load-out and tie-down arrangements shall be subject to review and acceptance by OWNER. Acceptance by OWNER shall in no way relieve CONTRACTOR of any liabilities with regard to CONTRACTOR’s faulty workmanship, loss of cargo, etc. 16.9 CONTRACTOR shall review and approve spare material ordered for contingency. Survey: ▇▇▇▇▇▇ ▇. ▇▇▇▇▇▇ Dredging: ▇. ▇. ▇▇▇▇, ▇▇▇▇▇ Brothers Board Road: ▇▇▇▇▇▇ Construction, Soloco, BLR Contractors NDE Inspection: Oceaneering Diving Services: Epic Companies, Triton Diving, G&G Marine Hydrotesting: ▇▇▇▇▇▇▇▇▇▇▇ Pipeline Services FBE Coating: Commercial Coating 1. Contractor assumes that the Environmental Coordinator and/or Environmental Inspector will be provided by Owner. 2. Commissioning activities involving gas handling or placement of the pipeline into Natural Gas Operations is not included in the Scope of Work. 3. The Estimated Contract Price includes the cost of tie-ins that are anticipated based upon the Drawings. The location of all such anticipated tie-ins are specified in the Pricing Schedule, Attachment J. Additional tie-ins, beyond those anticipated and specified in the Pricing...
At Final Completion the Design-Builder shall deliver to the Owner a final accounting of the Cost of the Work.
At Final Completion. 8.2.1 The Company shall allot and issue the Subscription Shares to the Investor and shall enter the Investor's name in the register of members of the Company. 8.2.2 The Investor shall pay the Consideration to the Company. 8.2.3 The Company shall allot and issue to ▇▇▇▇▇ ▇▇▇▇ (as trustee for certain persons referred to as the `Constructors' in a declaration of trust executed by ▇▇▇▇▇ ▇▇▇▇ on 4 May 2000) 55,815 Ordinary Shares at par. 8.2.4 The Company shall deliver to the Investor each of the documents listed in Part 1 of Schedule 6. 8.2.5 The Investor shall deliver to the Company each of the documents listed in Part 2 of Schedule 6. 8.2.6 The Investor, the Company and Senior Management shall enter into the Shareholder's Agreement. 8.2.7 The Company and Indigo shall enter into the Clarification and Termination Agreement.

Related to At Final Completion

  • Final Completion The full and final completion of all Work in accordance with the Contract Documents.

  • Substantial Completion 9.8.1 When the Contractor considers that the Work, or a designated portion thereof which has been accepted in writing to by the State, is substantially complete as defined in Subparagraph

  • Substantial Completion Date Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31, 2022.

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.