Task Description This task includes activities associated with permit-required monitoring conducted in accordance with the conditions specified by state or federal regulatory agencies. All monitoring tasks must be located within or adjacent to the Project area and follow the Department’s Regional Coastal Monitoring Program and FWC's marine turtle and shorebird monitoring programs. Guidance for monitoring of nearshore resources is available in the Department's Standard Operation Procedures For Nearshore Hardbottom Monitoring Of Beach Nourishment Projects. The Local Sponsor must submit work products directly to the appropriate state or federal regulatory agencies in accordance with permit conditions to be eligible for reimbursement under this task, unless otherwise directed.
COPIES OF REGULATORY REPORTS AND FILINGS Upon reasonable request, Competitive Supplier shall provide to the Town a copy of each public periodic or incident-related report or record relating to this ESA which it files with any Massachusetts or federal agency regulating rates, service, compliance with environmental laws, or compliance with affirmative action and equal opportunity requirements, unless the Competitive Supplier is required by law or regulation to keep such reports confidential. The Town shall treat any reports and/or filings received from Competitive Supplier as confidential information subject to the terms of Article 16. Competitive Supplier shall be reimbursed its reasonable costs of providing such copies.
System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass ▇▇▇▇▇▇. In addition to runoff conveyance, the grass ▇▇▇▇▇▇ also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off- site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12- inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1-2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after Waukesha County accepts verification of construction from the project engineer.
Accuracy of Descriptions and Exhibits The information in the Pre-Pricing Prospectus and the Prospectus under the caption “Material United States Federal Income Tax Consequences” and the information in the Annual Report under the captions “Business—Gas Utility—Regulatory Matters,” “Legal Proceedings,” “Management’s Discussion and Analysis of Financial Condition and Results of Operations—Critical Accounting Estimates—Regulatory Accounting” and “Management’s Discussion and Analysis of Financial Condition and Results of Operations—Regulatory Matters,” and in Item 13 thereof under the caption “Certain Relationships and Related Transactions, and Director Independence,” in each case to the extent that it constitutes matters of law, summaries of legal matters, summaries of provisions of the Company’s Organizational Documents or any other instruments or agreements, summaries of legal proceedings, or legal conclusions, is correct in all material respects; all descriptions in the Registration Statement, the General Disclosure Package and the Prospectus of any other Company Documents are accurate in all material respects; and there are no franchises, contracts, indentures, mortgages, deeds of trust, loan or credit agreements, bonds, notes, debentures, evidences of indebtedness, leases or other instruments, agreements or documents required to be described or referred to in the Registration Statement, the Pre-Pricing Prospectus or the Prospectus or the documents incorporated or deemed to be incorporated by reference therein or to be filed as exhibits to the Registration Statement or the documents incorporated or deemed to be incorporated by reference therein that have not been so described and filed as required.
ITEM DESCRIPTION Equipment (include VIN, make, model, year, serial no., accessories, or other identifying features): 12. NO. OF OPERATORS PER SHIFT 13. HRLY/ DAILY/ MILEAGE SHIFT BASIS 14. SPECIAL 15. GUARANTEE (8 HOURS) Portable Toilet Rental – Serviced(Includes first day delivery/last day pickup and daily rental rate per unit) 1 $75 Daily Ea. Portable Toilet Rental – Unserviced(Rental only, no daily service call) 1 $45 Daily Ea. Accessible Portable Toilet Rental – Serviced(Includes first day delivery/last day pickup and daily rental rate per unit) 1 $95 Daily Ea. Accessible Portable Toilet Rental – Unserviced(Rental only, no daily service call) 1 $65 Daily Ea.