Changes Requested by MSV Clause Samples

Changes Requested by MSV 

Related to Changes Requested by MSV

  • Notices Effective From A Notice will be deemed to have been duly given 1 business day after delivery if the Notice is delivered personally, by pre-paid courier or by mail. A Notice that is delivered by facsimile with confirmation of receipt or by email where no delivery failure notification has been received will be deemed to have been duly given 1 business day after the facsimile or email was sent.

  • Transmission Delivery Service Implications Under ER Interconnection Service, Interconnection Customer will be eligible to inject power from the Generating Facility into and deliver power across the Transmission System on an “as available” basis up to the amount of MW identified in the applicable stability and steady state studies to the extent the upgrades initially required to qualify for ER Interconnection Service have been constructed. After that date FERC makes effective MISO’s Energy Market Tariff filed in Docket No. ER04-691-000, Interconnection Customer may place a bid to sell into the market up to the maximum identified Generating Facility output, subject to any conditions specified in the Interconnection Service approval, and the Generating Facility will be dispatched to the extent the Interconnection Customer’s bid clears. In all other instances, no transmission or other delivery service from the Generating Facility is assured, but Interconnection Customer may obtain Point-To-Point Transmission Service, Network Integration Transmission Service or be used for secondary network transmission service, pursuant to the Tariff, up to the maximum output identified in the stability and steady state studies. In those instances, in order for Interconnection Customer to obtain the right to deliver or inject energy beyond the Point of Interconnection or to improve its ability to do so, transmission delivery service must be obtained pursuant to the provisions of the Tariff. The Interconnection Customer’s ability to inject its Generating Facility output beyond the Point of Interconnection, therefore, will depend on the existing capacity of the Transmission or Distribution System as applicable, at such time as a Transmission Service request is made that would accommodate such delivery. The provision of Firm Point-To-Point Transmission Service or Network Integration Transmission Service may require the construction of additional Network or Distribution Upgrades.

  • Liability for Failure to Stop Payment of Preauthorized Transfers If you order us to stop payment of a preauthorized transfer three (3) business days or more before the transfer is scheduled and we do not do so, we will be liable for your losses or damages.

  • Multiple notices; action without notice The Agent may serve notices under paragraphs (a) (i) and (ii) of Clause 19.2 simultaneously or on different dates and it and/or the Security Trustee may take any action referred to in that Clause if no such notice is served or simultaneously with or at any time after the service of both or either of such notices.

  • Changes to the Notice Information Either Party may change this information by giving five Business Days written notice prior to the effective date of the change.