Common use of Classroom Training Clause in Contracts

Classroom Training. Contractor shall prepare and carry out an extensive classroom-training program for sixty (60) Owner designated operations, maintenance and technical personnel at the Liquefaction Facility Site during the construction period. This program shall contain not less than eight (8) full weeks of full-time training. Contractor shall prepare for Owner approval a detailed outline of this training program within twelve (12) months of Notice to Proceed. In addition, Contractor shall provide for training by mutually agreed vendor representatives for Owner designated personnel. Subcontractor vendors to be included, as a minimum, are: ConocoPhillips, BASF, refrigeration compressor vendor, power generation vendor, DCS system vendor, anti-surge controller vendor, safety shutdown systems vendor, and emergency power generator vendor. Trainees must have completed classroom and vendor training, and be ready for field assignment six (6) months prior to RFSU of a New Plant System. For operations and maintenance personnel, training must be completed six (6) months prior to RFSU of a New Plant System. This applies to classroom training, and not to on-the-job training and qualification. Classroom training will be divided into specific subject areas as follows: • Process Description and Operating Principles • Special Equipment and Instrumentation • Plant System Manuals • Standard Operating Procedures • Service Procedures • Abnormal and Emergency Conditions and Troubleshooting • Commissioning and Start-up Contractor shall propose a training program in order to permit Owner operations and maintenance personnel to attend training sessions organized in Subcontractor shops and/or at the Liquefaction Facility Site by Subcontractor representatives for equipment operations and maintenance training sessions organized in Contractor’s facilities (home office and field) for Project operation. Such maintenance training sessions to be available in Subcontractor shops or at the Liquefaction Facility Site shall be fully identified and should include items such as, but not limited to: • Propane and MR compressors and drivers; • BOG compressor; • Air compressor; • Air dryers; • Demin Water; • DCS and control systems; • HVAC; • Gas turbine generator; • Waste Heat Recovery (WHRU); • Heavies Removal unit (HRU); • Main switchgears and motor control centers; • Nitrogen Generation units; • Direct-fired heaters; • Flares and Thermal Oxidizer; • H2S Removal unit; • Effluents treatment; • Amine re-circulation pumps; • Diesel generators; and • A complete training plan identifying the number of sessions together with number of trainees is to be submitted.

Appears in 2 contracts

Sources: Lump Sum Turnkey Agreement (Cheniere Energy Partners, L.P.), Lump Sum Turnkey Agreement (Cheniere Energy Partners, L.P.)