Cleanup of Spills Clause Samples

POPULAR SAMPLE Copied 1 times
Cleanup of Spills. All chemical storage facilities will have a containment area in case of an accidental spill. In the event of an accidental spill during the test, it will be the Contractor’s responsibility to immediately notify the City and to take all the necessary steps to properly contain and clean such spill to the prevailing standards required by local, state and/or federal regulations governing such incidents. The Contractor shall also be responsible for the proper disposal of all spills and refuse resulting from the clean-up. If necessary, the contaminated waste shall be stored in a secured area and be removed as promptly as practical by the Contractor.
Cleanup of Spills. Contractor shall immediately clean up any Solid Waste, Landscape Waste, or Recyclable Materials that it may have caused to spill onto private premises, parkways, streets, alleys or other public places, in a neat and workmanlike manner.
Cleanup of Spills. All loads collected by the Contractor shall be completely contained in collection vehicles at all times, except when material is actually being loaded. Hoppers on all collection vehicles shall be operated so as to prevent blowing or spillage of materials. Any blowing or spillage of materials either caused by Contractor or that occurs during collection shall be immediately cleaned up by the Contractor at its expense. Prior to any collection vehicle leaving a collection route and/or operating on any roads with a speed limit higher than 25 miles per hour, Contractor shall completely close any collection vehicle openings where materials may blow out, and thoroughly inspect for and remove any collected materials inadvertently spilled on top of the collection vehicle to prevent release or littering of this material. Spillage not immediately cleaned up shall be cause for performance fees, as described in Section 11.2. All vehicles used in the performance of this Contract shall be required to carry and regularly maintain spill kits. At a minimum, spill kits shall include absorbent pads or granules, containment booms, storm drain covers, sweepers and other similar materials sufficient to contain, control and, for minor events, appropriately clean-up, blowing materials, litter, leaks and spillage of Contractor vehicle fluids and leachate. Spill kits shall also include employee spill containment instructions and procedures as well as a regularly updated list of emergency contacts. The Contractor shall develop spill response procedures for review and approval by the City before initiating any work under this Contract. All Contractor vehicle drivers shall be provided with annual hands-on training on the location, maintenance, and use of spill kits and associated containment and notification procedures. All Drop Box Container loads (both open and compactor) shall be properly and thoroughly covered or tarped to prevent any spillage of material prior to Contractor vehicle entering any Private Road or Public Street.
Cleanup of Spills. Contractor shall immediately clean up any Municipal Waste, Landscape Waste, or Recyclable Materials that it may have caused to spill onto private premises, parkways, streets, alleys or other public places, in a neat and workmanlike manner. If such materials or fluids are not cleaned up within eight hours after being reported to Contractor (verbally or in writing), the Village may perform the cleanup and bill the cost to Contractor. All charges levied against the Contractor under this Section 9.3(b) shall be remitted to the Village within 30 days after receipt of an invoice therefor.
Cleanup of Spills. All chemical storage facilities will have a containment area in case of an accidental spill. In the event of an accidental spill during the test, it will be the Company’s responsibility to immediately notify the City and to take all the necessary steps to properly contain and clean such spill to the prevailing standards required by local, state and/or federal regulations governing such incidents. The Company shall also be responsible for the proper disposal of all spills and refuse resulting from the clean-up. If necessary, the contaminated waste shall be stored in a secured area and be removed as promptly as practical by the Company. To the extent that a spill occurs due to the fault of Company, then Company shall bear the costs of the activities set forth in this section. To the extent that a spill is not due to the fault of Company, then the City shall bear such costs.
Cleanup of Spills. Franchisee will handle all Carts and containers with reasonable care to avoid damage and spillage. Any contents spilled or items broken by collection crews onto parkways, premises, curb-and-gutters or streets shall be immediately cleaned up in a good workmanlike manner. In order to clean up, a broom and shovel shall be required on each vehicle. Franchisee shall immediately clean up any Solid Waste, Landscape Waste, or Recyclable Materials that it may have caused to spill onto private premises, parkways, streets, alleys or other public places, in a neat and workmanlike manner.

Related to Cleanup of Spills

  • Remediation If Contractor claims that its products or services satisfy the applicable requirements and standards specified in Section 4.2.1 and it is later determined by HCA that any furnished product or service is not in compliance with such requirements and standards, HCA will promptly inform Contractor in writing of noncompliance. Contractor shall, at no additional cost to HCA, repair or replace the non-compliant products or services within the period specified by HCA. If the repair or replacement is not completed within the specified time, HCA may cancel the Contract, delivery, task order, or work order, or purchase line item without termination liabilities or have any necessary changes made or repairs performed by employees of HCA or by another contractor, and Contractor shall reimburse HCA for any expenses incurred thereby.

  • Responsibility for Environmental Contamination 5.20.1 Neither Party shall be liable to the other for any costs whatsoever resulting from the presence or release of any Environmental Hazard that either Party did not introduce to the affected Work Location. Both Parties shall defend and hold harmless the other, its officers, directors and employees from and against any losses, damages, claims, demands, suits, liabilities, fines, penalties and expenses (including reasonable attorneys' fees) that arise out of or result from (i) any Environmental Hazard that the Indemnifying Party, its contractors or agents introduce to the Work Locations or (ii) the presence or release of any Environmental Hazard for which the Indemnifying Party is responsible under Applicable Law. 5.20.2 In the event any suspect materials within Qwest-owned, operated or leased facilities are identified to be asbestos containing, CLEC will ensure that to the extent any activities which it undertakes in the facility disturb such suspect materials, such CLEC activities will be in accordance with applicable local, state and federal environmental and health and safety statutes and regulations. Except for abatement activities undertaken by CLEC or equipment placement activities that result in the generation of asbestos-containing material, CLEC does not have any responsibility for managing, nor is it the owner of, nor does it have any liability for, or in connection with, any asbestos-containing material. Qwest agrees to immediately notify CLEC if Qwest undertakes any asbestos control or asbestos abatement activities that potentially could affect CLEC personnel, equipment or operations, including, but not limited to, contamination of equipment.

  • Cleanup Awarded vendor shall clean up and remove all debris and rubbish resulting from their work as required or directed by TIPS Member. Upon completion of work, the premises shall be left in good repair and an orderly, neat, clean and unobstructed condition.

  • Contamination The presence in, on or under land, air or water of a substance (whether a solid, liquid, gas, odour, heat, sound, vibration or radiation) at a concentration above the concentration at which the substance is normally present in, on or under land, air or water in the same locality, that presents a risk of Environmental Harm, including harm to human health or any other aspect of the Environment, or could otherwise give rise to a risk of non-compliance with any Statutory Requirement for the protection of the Environment.