Commissioning and Completion Clause Samples

POPULAR SAMPLE Copied 2 times
Commissioning and Completion. 13.1 Agreeing Final Commissioning Programme
Commissioning and Completion. 16.1 [Intentionally Deleted]
Commissioning and Completion. 7.1 The Connection Provider shall ensure that all pre-commissioning tests and checks listed in the Service Information Form or ICP HV Cable Assessment Form (as the case may be) are satisfactorily completed and recorded prior to Energisation. The Connection Provider shall not make any connection which fails the pre- commissioning tests. 7.2 The Connection Provider shall ensure that all post-commissioning tests listed in the Service Information Form or ICP HV Cable Assessment Form (as the case may be) are completed and recorded immediately following the Energisation of any new connection. 7.3 The Connection Provider shall complete the Service Information Form or ICP HV Cable Assessment Form detailing all pre-commissioning and post-commissioning tests carried out in respect of the Contestable Connection Works in relation to each LJNC or HVNC and shall provide such evidence and records as may be reasonably required by WPD that the required tests have been completed and passed. WPD may carry out its own tests and checks at any time. 7.4 If any of the Contestable Connection Works do not pass the post-commissioning tests the Connection Provider shall immediately notify WPD and WPD may: (a) on safety grounds, under ESQCR Regulation 26, disconnect the Contestable Connection Works from WPD’s Distribution System until the Connection Provider undertakes all work necessary to enable the Contestable Connection Works to pass the post-commissioning tests; or (b) undertake such works and recover the cost thereof from the Connection Provider. 7.5 The Connection Provider shall complete the low voltage Contestable Connection Works within the week proposed in the relevant LJNC. If the Connection Provider fails to complete the low voltage Contestable Connection Works within the week specified in the relevant LJNC, the Connection Provider shall cease work, WPD's approval provided pursuant to Clause 3.3 shall be deemed to have been withdrawn and the Connection Provider shall be required to recommence the approval process and submit a new LJNC for the relevant Contestable Connection Works. 7.6 The Connection Provider shall provide to WPD a completed LJCC and Service Information Form on or before the second Monday following the week during which the low voltage Contestable Connection Works are carried out. 7.7 The Connection Provider shall commence and complete the high voltage Contestable Works on the dates and by the time agreed with WPD pursuant to clause 3.4; 7.8 If the Connect...
Commissioning and Completion 

Related to Commissioning and Completion

  • Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.

  • PROGRESS AND COMPLETION 8.2.1 All time limits stated in the Contract Documents are material terms and time is the essence of the Contract. A failure by Contractor to do what is required by the time specified in the Contract Documents is a breach of the contract. 8.2.2 The Contractor shall begin the Work on the date of commencement as defined in 8.2.3 If in the sole opinion of the State, the Contractor fails to commence work on the project or to complete the work of said project within the time specified above, or to prosecute the work in such a manner that it appears that the completion date can be assured, the State shall have the right to notify the Contractor by Certified Mail that the terms of the Contract have been violated, and that effective immediately the Contract is terminated and the State has the right to and in fact is taking over and attending to completion of the project without prejudice to the State's remedies for any losses sustained

  • Project Completion The Contractor agrees to schedule a final job walk with the County. If required, the County will prepare a list of incomplete items, the “Punch List”. The Contractor agrees to complete the “Punch List” corrections and schedule a final project completion job walk. The County will sign the “Punch List” as completed when determined, the project is finished. The Contractor agrees to submit the following along with its final payment request:

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.