COMMISSIONING OF THE WORKS Clause Samples

COMMISSIONING OF THE WORKS. The Contractor shall perform Commissioning of the Works, as further detailed in Appendix 1B.
COMMISSIONING OF THE WORKS. 1.34.1 When installation stage is complete, The Contractor must submit operating manual to The Employer and as-built drawings within 7 days. An appointment date for commissioning must be arranged by The Contractor with 2 weeks after submitting operating manual and as-built drawings. During commissioning the following checks are to be done: ✓ Verification and calibration of oil (i.e. if applicable) and winding instruments ✓ Verification of functionality of cooling fan start signals, alarms and trip signals. ✓ Cooling equipment checks. ✓ Check control circuit cabling and auxiliary power cabling. ✓ Checking of pressure relief valve (i.e. if applicable) ✓ Checking of rapid rise pressure relay. ✓ Checking of tap changer over pressure switch. 1.34.2 A checklist page prepared by The Contractor is to be used to tick each step of commissioning process by stakeholders and The Employer can issue a snag list to The Contractor after this process, of which The Contractor must fix within a period agreed between two parties. No payments are to be made by The Employer until all snags are completed and snag list signed off by The Project Manager. 1.34.3 When checks and visual snags are completed, the following tests are to be completed by The Contractor: ✓ Swept frequency response analysis (SFRA) ✓ Ratio, polarity, and vector group verification. ✓ Tan delta/Power Factor/Dielectric dissipation factor and capacitance tests on winding. ✓ Excitation/Magnetising current tests. ✓ Impedance/Leakage reactance test. (Compare to nameplate and factory tests) ✓ Zero sequence impedance tests ✓ Insulation resistance test on windings, core, and frame to earth (i.e., Megger) ✓ Current transformer testing. 1.34.4 The Contractor must submit test certificates to The Employer within two weeks after commissioning. The Employer is to pay maximum 75% the contract value before commissioning, as per cost projections and actual work completed in stages of the project. However, the remaining 25% will be paid to The Contractor 30 days after successful commissioning date and completion of snags (i.e., provided no faults occur in before 30 days is depleted).

Related to COMMISSIONING OF THE WORKS

  • Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Handover 14.1 It is a fundamental requirement by SANParks that the transfer of the AENP ▇▇▇▇ Braai Facility is undertaken on the basis that: 14.1.1 there is no or minimal disruption in the provision of goods and services to visitors to the Protected Area and includes use of vehicles for products on offer to visitors to the Protected Area; 14.1.2 any structural alterations do not cause the AENP ▇▇▇▇ Braai Facility to be closed unless alternatives are provided (unless it was closed in any event); 14.1.3 the handover shall be undertaken in such a manner to cause the least disruption and/or intrusion to SANParks and employees and then only in a manner which is mutually acceptable to both SANParks and the Private Party; 14.1.4 the Business will be conducted in the usual manner throughout the Handover Period; and 14.1.5 SANParks shall not be liable for any claims or actions which arise during the Handover Period irrespective of the cause or nature of same. 14.2 During the Handover Period: 14.2.1 the Private Party and SANParks shall co-operate and work together to achieve an effective transfer of control and management of AENP ▇▇▇▇ Braai Facility to the Private Party on the Operation Commencement Date; 14.2.2 the Private Party shall be entitled to nominate one or more representatives to be stationed at the AENP ▇▇▇▇ Braai Facility , to work with SANParks management to effect a smooth handover. The Private Party’s representatives shall however have no authority in relation to SANParks operations or employees during the Handover Period. 14.3 On the Operation Commencement Date, the Private Party shall assume full responsibility under this PPP Agreement for the operations, and expenses thereof, relating to the AENP ▇▇▇▇ Braai Facility , and be entitled to the fruits hereof.