Compaction Method Clause Samples
The Compaction Method clause defines the specific procedures and standards to be used for compacting soil, gravel, or other materials during construction projects. It typically outlines the type of equipment, number of passes, moisture content, and testing requirements to ensure the material reaches the desired density and stability. By clearly specifying how compaction should be performed, this clause helps ensure the structural integrity of the project and prevents future issues such as settling or uneven surfaces.
Compaction Method. 4. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer.
Compaction Method. Maintenance Segments, As Agreed Pit Run Gravel1/ To Be Placed as Directed by USFS (During Haul Road Maintenance). 100 CY (130 CY)2/ See 3.2 Above
Compaction Method. All Gravel As needed 20 CY N/A finished depth checks for the placed and compacted aggregate . Widths and lengths will be as staked or from schedule. When it is mutually agreed that all or part of the Surface Course Material is not needed, the estimated cost of surfacing not placed shall be charged to the Timber Sale Account in accordance with BT8.31. CT5.32# - ROAD MAINTENANCE DEPOSIT SCHEDULE (08/2012) Other provisions herein notwithstanding, when Forest Service requests payment in lieu of Contractor's performance of road maintenance, Contractor shall make Required Deposits (16 USC 537) for current and/or deferred road maintenance. Such deposits are based on the estimated volume and distance hauled and Contractor's commensurate use of each road listed in the Road Maintenance Plan in CT5.31#. Contractor and Forest Service may agree in writing on adjustment of such rates. If Contractor uses roads under jurisdiction of Forest Service other than those listed in the Road Maintenance Plan, Forest Service shall establish rates commensurate with Contractor's use of such roads. The Required Deposits for Forest Service work in lieu of Contractor performance are N/A per CCF for recurrent maintenance, and $.18 per CCF for deferred maintenance. The following table lists who Contractor will make deposits for road maintenance to, and the rate per unit of measure of the deposit. The Road Maintenance Agreement is available for inspection at the Forest Supervisor's Office. CT5.33# - SNOW REMOVAL (06/2009) Snow removal shall be done in a manner that will preserve and protect roads, provide for safe and efficient transport of timber, and prevent erosion damage to streams and adjacent lands. In performing snow removal, Contractor shall adhere to the following performance standards, unless otherwise agreed: Blade will be equipped with skid shoes to prevent loss of surfacing and damage to the road bed. On gravel and native surface roads, a minimum four (4) -inch depth compacted snow mat shall be maintained on the roadbed during blading. Snow shall be removed from the entire road width, including turnouts. Snow berms shall be reduced at road intersections where plowed road segements join unplowed road segments. Reduce the piled snow in the roadway to create a smooth transition from plowed road to normal snow depth. Openings shall be created in snow berms as needed for proper drainage. Remove snow, ice, and debris from culverts and other drainage structures as needed to ensure ef...
Compaction Method. Any Maintenance road in sale Pit Run1/ (As Needed) 100 CY(130 CY)3/ See 3.2 above
Compaction Method. Any Maintenance road in Sale Area Pit Run1/ (As Needed) 140 CY (182 CY)2/ See 3.2 above 1/ Six Mile Pit, as shown on Sale Area Map 2/Quantity of Material in ( ) = Approximate Loose Volume *See WO-CT5.31# Summary Table Variations. The Purchaser will be required to furnish weight tickets to the FS for each load of commercially obtained crushed aggregate prior to the final inspection. For aggregate purchased from the government, a count of truck loads will be required in addition to finished depth checks for the placed and compacted aggregate. Widths and lengths will be as staked or from schedule. When it is mutually agreed that all or part of the Surface Course Material is not needed, the estimated cost of surfacing not placed shall be charged to the Timber Sale Account in accordance with BT8.31.
Compaction Method. Any Maintenance road in sale Pit Run1/ (As Needed) 50 CY(65 CY)3/ See 3.2 above 1100-O Crushed Aggregate2/ (As Staked) 15 CY (20 CY)3/ See 3.2 above 1140-G Crushed Aggregate2/ (As Staked) 15 CY (20 CY)3/ See 3.2 above 1140-G Pit Run1/ (As Needed) 190 CY(248 CY)3/ See 3.2 above 1147 Crushed Aggregate2/ (As Staked) 15 CY (20 CY)3/ See 3.2 above 1151 Crushed Aggregate2/ (As Staked) 15 CY (20 CY)3/ See 3.2 above 1151-G Crushed Aggregate2/ (As Staked) 15 CY (20 CY)3/ See 3.2 above 1151-G Pit Run1/ (As Needed) 15 CY (20 CY)3/ See 3.2 above
Compaction Method. 5010-A (MP 0.00–0.01) Crushed Aggregate1/ Surface Radii & Approach 15 CY (19.5 CY)2/ See 3.2 Above 5010-A1 (MP 0.00–0.44) Crushed Aggregate1/ To Be Placed as Directed by USFS as During Haul Road Maintenance & Bike Trail Protection. 30 CY (39 CY)2/ See 3.2 Above 5010-C1 (MP 0.46) Crushed Aggregate1/ Surface Radii & Approach to Military Road at ▇▇▇ 15 CY (19.5 CY)2/ See 3.2 Above Any Purchaser Responsibility Maintenance Rd Pit Run Gravel3/ To Be Placed as Directed by USFS (During Haul Road Maintenance). 60 CY (78 CY)2/ See 3.2 Above 1/Furnish, Haul, Place. Must Meet M-DOT Designation 22A 2/Quantity of Material in ( ) = Approximate Loose Volume 3/ Pit Lake Pit (as shown on Sale Area Map).
Compaction Method. FR 3324 Crushed Aggregate1/ (As Needed and Agreed to) 30 CY (39 CY)2/ See 3.2 above Any Maintenance road in Sale Area Crushed Gravel or Pit Run1/ (As Needed) 250 CY (325 CY)2/ See 3.2 above 1/ San ▇▇▇▇▇ Pit, as shown on Sale Area Map 3/Quantity of Material in ( ) = Approximate Loose Volume
Compaction Method. Any Maintenance road in Contract Area Crushed Aggregate1/ (As Needed) 200 CY (260 CY)3/ See 3.2 above 1/Section 18 Pit, as shown on Contract Area Map 2/Quantity of Material in ( ) = Approximate Loose Volume
Compaction Method. Any Maintenance road in sale Pit Run1/ (As Needed) 100 CY(130 CY) See 3.2 above 2204 Crushed Aggregate3/ (As Staked) 15 CY (20 CY) See 3.2 above 2204-G Crushed Aggregate3/ (As Staked) 15 CY (20 CY) See 3.2 above 2213 Crushed Aggregate3/ (As Staked) 15 CY (20 CY) See 3.2 above 2213-E Crushed Aggregate3/ (As Staked) 15 CY (20 CY) See 3.2 above 2213-K Crushed Aggregate3/ (As Staked) 15 CY (20 CY) See 3.2 above 3.3 Variations. The Purchaser will be required to furnish weight tickets to the FS for each load of commercially obtained crushed aggregate prior to the final inspection. For aggregate purchased from the government, a count of truck loads will be required in addition to finished depth checks for the placed and compacted aggregate. Widths and lengths will be as staked or from schedule. When it is mutually agreed that all or part of the Surface Course Material is not needed, the estimated cost of surfacing not placed shall be charged to the Timber Sale Account in accordance with BT8.31.