COMPACTION OF BACKFILL Sample Clauses

COMPACTION OF BACKFILL. The backfilling of any trench within the paved portion of the highway, the shoulders thereof, or the portion under or intersecting street or highway shall be thoroughly compacted. Method of compaction shall be subject to review by the METRO or METRO’s agent. The GRANTEE shall be liable for any damage which may result to the pavement due to failure to properly compact the backfill.
COMPACTION OF BACKFILL. The backfilling of any trench within the paved portion of the roadway, the shoulders thereof, or the portion under an intersecting street or roadway shall be thoroughly compacted to generally accepted industry standards and City standards. The method of compaction shall be subject to inspection and approval by the City. The Owner shall be liable for any damage to persons, property, or the pavement, due to its negligence in the compaction of backfill material.
COMPACTION OF BACKFILL. When compacting the soil against steep rock abutment walls of masonry or concrete structures, the construction surface of embankment shall be sloped away from the rock or masonry or concrete structure leaving a minimum distance of 0.6 metre and at an inclination of 3:1. Rollers shall not be used close to structures as structural damage is very likely more particularly when structures have not been fully, cured. The size and weight of equipment will depend on nature of material, the height and load assumed in design of structure. The backfill close to the structure up to the rolled layer shall be compacted in suitable uniform layers using pneumatic / hand tampers at appropriate for dry density of at least 90% of Standard ▇▇▇▇▇▇▇ Density. The moisture content of the earth fill placed against the rock or the structure shall be on higher side of OMC by about 2% or so, to allow it to be compacted into all irregularities of the rock. Profused watering shall be done to pervious materials, (sand) before compaction as per instruction of the Engineer-in-Charge. Compaction at junction of earthwork and backfill around the structure shall be carried out with special care without claiming any extra cost. Measurement and Payment

Related to COMPACTION OF BACKFILL

  • Compaction 11.1 Concrete shall be thoroughly compacted and fully worked around the reinforcement, around embedded fixtures and into corners of the formwork. 11.2 Concrete shall be compacted using mechanical vibrators complying with IS 2505, IS 2506, IS 2514 and IS:4656. Over vibration and under vibration of concrete are harm full and shall be avoided. Vibration of very wet mixes shall also be avoided. Whenever vibration has to be applied externally, the design of formwork and the disposition of vibrators shall receive special consideration to ensure efficient compaction and to avoid surface blemishes.

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit E during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep all of the operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System.

  • Cost Containment The Benefit Fund Trustees are directed to explore all reasonable methods of cost containment to minimize the Employer contribution obligations under the contract. In the event Medicare becomes secondary in the application of the retiree benefit plan, the Trustees will take immediate and remedial action to protect the financial integrity of the Plan.