Concurrent submittals Sample Clauses

The "Concurrent submittals" clause defines the process by which multiple project documents, drawings, or samples can be submitted for review at the same time rather than sequentially. In practice, this allows contractors or suppliers to submit several required items together, expediting the review and approval process and reducing potential project delays. The core function of this clause is to streamline project workflows and improve efficiency by enabling simultaneous consideration of related submittals, thereby minimizing bottlenecks and ensuring timely project progress.
Concurrent submittals. When a substantial development permit and a conditional use or variance permit are required for a development, the submittal on the permits shall be made concurrently.
Concurrent submittals. When a substantial development permit and a conditional use or variance permit are required for a development, the submittal on the permits shall be made concurrently. Submittal requirements. A complete submittal shall consist of the following documents and information: A copy of the complete application pursuant to Section 8.5, Shoreline permit application requirements; Findings and conclusions that establish the basis for the decision including but not limited to identification of shoreline environment designation, applicable policies and regulations of the City’s Shoreline Master Program and the consistency of the project with appropriate review criteria for the type of permit(s) as established in Section 8.7, Shoreline permit review criteria; The final decision of the City; The permit data sheet required by WAC ▇▇▇-▇▇-▇▇▇; and

Related to Concurrent submittals

  • Submittals Submittals required by the Contract Documents shall be prepared specifically for the Work by the Contractor to illustrate some portion of the Work. Submittals are not Contract Documents.

  • Submittal Schedule Within sixty days after the Effective Date of the Contract, the Contractor shall prepare and submit a Submittal Schedule for review and approval of the Design Professional. In establishing the Submittal Schedule the Contractor shall take into account large submittal documents that will require longer review times, e.g., submittals with over fifty sheets of drawings. The Design Professional’s approval shall be based on conformance of the Submittal Schedule with the Overall Project Schedule, subject to change from time to time in accordance with the progress of the Work.

  • Submittal Reports, plans, surveys, field notes, original drawings, computer tapes, graphic files, tracings, calculations, analyses, reports, specifications, data, sketches and/or schematics prepared by A/E and supporting documents (collectively referred to hereinabove and hereinafter as the "A/E Work Product(s)"), shall be submitted by A/E on or before the dates specified for completion, as set out in the Production Schedule set forth in Exhibit C.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents. 9.2 Materials or Work described in words that so applied have a well-known technical or trade meaning shall be deemed to refer to recognized standards, unless noted otherwise. 9.3 Trade Name or Trade Term It is not the intention of the Contract Documents to go into detailed descriptions of any materials and/or methods commonly known to the trade under “trade name” or “trade term.” The mere mention or notation of “trade name” or “trade term” shall be considered a sufficient notice to Developer that it will be required to complete the work so named, complete, finished, and operable, with all its appurtenances, according to the best practices of the trade. 9.4 The naming of any material and/or equipment shall mean furnishing and installing of same, including all incidental and accessory items thereto and/or labor therefor, as per best practices of the trade(s) involved, unless specifically noted otherwise. 9.5 Contract Documents are complementary, and what is called for by one shall be binding as if called for by all. As such, Drawings and Specifications are intended to be fully cooperative and to agree. However, if Developer observes that Drawings and Specifications are in conflict with the Contract Documents, Developer shall promptly notify District and Architect in writing, and any necessary changes shall be made as provided in the Contract Documents. 9.6 Figured dimensions shall be followed in preference to scaled dimensions, and Developer shall make all additional measurements necessary for the work and shall be responsible for their accuracy. Before ordering any material or doing any work, each Developer shall verify all measurements at the building and shall be responsible for the correctness of same. 9.7 Should any question arise concerning the intent or meaning of the Contract Documents, including the Plans and Specifications, the question shall be submitted to the District for interpretation. If a conflict exists in the Contract Documents, these Construction Provisions shall control over the Facilities Lease, which shall control over the Site Lease, which shall control over Division 1 Documents, which shall control over Division 2 through Division 49 documents, which shall control over figured dimensions, which shall control over large-scale drawings, which shall control over small-scale drawings. In no case shall a document calling for lower quality and/or quantity of material or workmanship control. However, in the case of discrepancy or ambiguity solely between and among the Drawings and Specifications, the discrepancy or ambiguity shall be resolved in favor of the interpretation that will provide District with the functionally complete and operable Project described in the Drawings and Specifications. 9.8 Drawings and Specifications are intended to comply with all laws, ordinances, rules, and regulations of constituted authorities having jurisdiction, and where referred to in the Contract Documents, the laws, ordinances, rules, and regulations shall be considered as a part of the Contract Documents within the limits specified. 9.9 As required by Section 4-317(c), Part 1, Title 24, CCR: “Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the DSA-approved documents wherein the finished work will not comply with Title 24, California Code of Regulations, a construction change document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by DSA before proceeding with the repair work.”

  • SUBMITTAL LABEL All submittals, should use the hard-copy label below and place on front of their outermost sealed envelope/package. Company : Contact Name: Contact Phone/ Email: Address: CONTACT: IFB NUMBER: TITLE: BID DUE DATE: ORANGE COUNTY PROCUREMENT DIVISION INTERNAL OPERATIONS CENTRE II ▇▇▇ ▇. ▇▇▇▇▇ ▇▇▇▇▇▇, 2ND FLOOR ORLANDO, FL 32801.