Condition of Transmission Line At End Of Term Sample Clauses

Condition of Transmission Line At End Of Term. Upon expiration or termination of this Agreement, Provider shall remove its personnel, including contractors and subcontractors, from the Transmission Line. Provider shall leave the Transmission Line in safe condition in accordance with Good Utility Practice, provided, however, that Provider (i) is not required to leave such Transmission Line in any better condition than is otherwise required under the other terms of this Agreement, and (ii) all reasonable Direct and Indirect Costs incurred by Provider in complying with this provision shall be paid by Owner. All special tools, improvements, inventory of supplies, spare parts, safety equipment, operating and procedure manuals, operating logs, records and documents paid for by Owner and maintained by Provider for the Transmission Line will, as determined by Owner, be left at the location of the applicable Transmission Facility or provided to Owner at its business office, and remain the property of Owner without additional charge. Owner shall also have the right, but not the obligation, in its sole discretion, to directly assume any contracts entered into by or obligations of Provider solely in connection with the Services for Transmission Line (but only to the extent such assumption is permitted under such contracts and otherwise in accordance therewith), provided Owner also expressly assumes in writing sole liability under such contracts for matters arising in connection with activities undertaken by Owner after the effective date of the assignment. Provider, at Owner’s cost, shall cooperate in taking all reasonable steps requested by Owner as required to effect the assignment of the contracts and to mitigate potential disruption of the operation, maintenance and management of the Transmission Facilities. To the fullest extent allowed by applicable Law, Owner shall indemnify, defend and hold Provider harmless from and against all liabilities arising under or in connection with any such assigned contract to the extent such costs, damages and liabilities arise after the effective date of the assignment of such contract to Owner.

Related to Condition of Transmission Line At End Of Term

  • Evaluation of Tenders 33.1 The Procuring Entity shall use the criteria and methodologies listed in this ITT and Section III, Evaluation and Qualification criteria. No other evaluation criteria or methodologies shall be permitted. By applying the criteria and methodologies, the Procuring Entity shall determine the Lowest Evaluated Tender. This is the Tender of the Tenderer that meets the qualification criteria and whose Tender has been determined to be: a) substantially responsive to the tender documents; and b) the lowest evaluated price. 33.2 Price evaluation will be done for Items or Lots (contracts), as specified in the TDS; and the Tender Price as quoted in accordance with ITT 14. To evaluate a Tender, the Procuring Entity shall consider the following: a) price adjustment due to unconditional discounts offered in accordance with ITT 13.4; b) converting the amount resulting from applying (a) and (b) above, if relevant, to a single currency in accordance with ITT 31; c) price adjustment due to quantifiable nonmaterial non-conformities in accordance with ITT 29.3; and d) any additional evaluation factors specified in the TDS and Section III, Evaluation and Qualification Criteria. 33.3 The estimated effect of the price adjustment provisions of the Conditions of Contract, applied over the period of execution of the Contract, shall not be considered in Tender evaluation. 33.4 Where the tender involves multiple lots or contracts, the tenderer will be allowed to tender for one or more lots (contracts). Each lot or contract will be evaluated in accordance with ITT 33.

  • Use of Interconnection Facilities by Third Parties 494950 9.9.1 Purpose of Interconnection Facilities 494950 9.9.2 Third Party Users. 50 9.10 Disturbance Analysis Data Exchange. 50 ARTICLE 10. MAINTENANCE 50 10.1 Participating TO Obligations. 50 10.2 Interconnection Customer Obligations. 50 10.3 Coordination 505051

  • Transmission Delivery Service Implications Under ER Interconnection Service, Interconnection Customer will be eligible to inject power from the Generating Facility into and deliver power across the Transmission System on an “as available” basis up to the amount of MW identified in the applicable stability and steady state studies to the extent the upgrades initially required to qualify for ER Interconnection Service have been constructed. After that date FERC makes effective MISO’s Energy Market Tariff filed in Docket No. ER04-691-000, Interconnection Customer may place a bid to sell into the market up to the maximum identified Generating Facility output, subject to any conditions specified in the Interconnection Service approval, and the Generating Facility will be dispatched to the extent the Interconnection Customer’s bid clears. In all other instances, no transmission or other delivery service from the Generating Facility is assured, but Interconnection Customer may obtain Point-To-Point Transmission Service, Network Integration Transmission Service or be used for secondary network transmission service, pursuant to the Tariff, up to the maximum output identified in the stability and steady state studies. In those instances, in order for Interconnection Customer to obtain the right to deliver or inject energy beyond the Point of Interconnection or to improve its ability to do so, transmission delivery service must be obtained pursuant to the provisions of the Tariff. The Interconnection Customer’s ability to inject its Generating Facility output beyond the Point of Interconnection, therefore, will depend on the existing capacity of the Transmission or Distribution System as applicable, at such time as a Transmission Service request is made that would accommodate such delivery. The provision of Firm Point-To-Point Transmission Service or Network Integration Transmission Service may require the construction of additional Network or Distribution Upgrades.

  • Program Requirements Provided At No Charge to the Judicial Council A. The Contractor shall provide the following items during the Program at no charge to the Judicial Council: i. Secured Program registration space, including two (2) easels, and one (1) house telephone. ii. Secured Meeting room, which will function as a centralized office area for the Judicial Council during the Program. iii. Secured Program storage space, which will be used to store any Materials that arrive at the Property within seventy-two (72) hours prior to the start of the Program. The Judicial Council will endeavor to ensure that all arriving Materials are marked with the Property’s address, contact’s name, and the date or name of the Program. Should Program Materials arrive at the Property more than seventy-two (72) hours before the commencement of the Program, the Contractor shall receive and store up to five (5) boxes of Materials at no charge. No less than one (1) hour prior to the commencement of the registration for the Program or commencement of the Program itself, the Contractor shall deliver all Materials at the time and to the location as directed by the Meeting Planner. iv. Complimentary guest room internet v. Five (5) complimentary parking passes

  • Access to Facility 13.1 Each Party shall ensure that its facilities are secured at all times. 13.2 The Customer shall permit and, if the land on which the Facility is located is not owned by Customer, cause such landowner to permit, the Distributor's employees and agents to enter the property on which the Facility is located at any reasonable time. Such access shall be provided for the purposes of inspecting and/or testing the Facility as and when permitted by this Agreement, the Code or the Distributor’s Conditions of Service or as required to ensure the continued safe and satisfactory operation of the Facility, to ensure the accuracy of the Distributor's meters, to establish work protection, or to perform work. 13.3 Any inspecting and/or testing referred to in section 13.2 shall not relieve the Customer from its obligation to operate and maintain the Facility and any related equipment in a safe and satisfactory operating condition and in accordance with this Agreement. 13.4 The Distributor shall have the right to witness any testing done by the Customer of the Facility and, to that end, the Customer shall provide the Distributor with at least fifteen working days advance notice of the testing. 13.5 Notwithstanding section 10.1, where the Distributor causes damage to the Customer's property as part of this access, the Distributor shall pay to the Customer the Customer's reasonable costs of repairing such property or, if such property cannot be repaired, replacing such property. 13.6 Notwithstanding section 10.1, if the Customer has been given access to the Distributor’s property, and if the Customer causes damage to the Distributor’s property as part of that access, the Customer shall pay to the Distributor the Distributor’s reasonable costs of repairing such property or, if such property cannot be repaired, replacing such property.