CONNECTING TRANSMISSION OWNER INTERCONNECTION FACILITIES. (CTO IFs)
CONNECTING TRANSMISSION OWNER INTERCONNECTION FACILITIES. The Connecting Transmission Owner Interconnection Facilities include: (1) EMS RTU; and miscellaneous materials and equipment associated w/ the installation of the metering and RTU. Equipment added as a result of the Steel Winds II project interconnection (Attachment 3, Figure 2): Two (2) revenue meter;
CONNECTING TRANSMISSION OWNER INTERCONNECTION FACILITIES. There are no Connecting Transmission Owner Interconnection Facilities required for the Interim Constrained Operation Interconnection. For the Final Interconnection, the Connecting Transmission Owner Interconnection Facilities include: Interconnection Facilities for the Small Generating Facility (Steel Winds II) (Sole Use Facilities) One (1) revenue meter;
CONNECTING TRANSMISSION OWNER INTERCONNECTION FACILITIES. There are no Connecting Transmission Owner Interconnection Facilities required for the Interim Constrained Operation Interconnection. For the Final Interconnection, the Connecting Transmission Owner Interconnection Facilities include: i. Interconnection Facilities for the Small Generating Facility (Steel Winds II) (Sole Use Facilities)  One (1) revenue meter;  Three (3) single phase metering Potential Transformers (PTs);  Three (3) single phase metering Current Transformers (CTs);  One (1) EMS RTU; and  miscellaneous materials and equipment associated w/ the installation of the metering and RTU. The Connecting Transmission Owner will supply, install, and test and commission all revenue metering equipment. The CTs and PTs will be installed outdoors in the Existing Collection Station on the 13.8kV structure. The Interconnection Customer will provide and install insulated mounting surfaces for all the units. The RTU will be supplied by the Connecting Transmission Owner. The Interconnection Customer will mount the RTU and wire AC and DC power to it in accordance with National Grid’s Electric Service Bulletin 756. The Connecting Transmission Owner will test and commission the RTU. ii. Steel Winds I Interconnection Facilities Modifications (Sole Use Facilities) Due to the addition of the Small Generating Facility (Steel Winds II) and at the Interconnection Customer’s expense, the revenue metering for the Steel Winds I project will be revised. The Interconnection Facilities associated with the modifications include:  Two (2) revenue meters;

Related to CONNECTING TRANSMISSION OWNER INTERCONNECTION FACILITIES

  • CONNECTING TRANSMISSION OWNER’S INTERCONNECTION FACILITIES As depicted on the one-line diagram in Attachment 3, the Connecting Transmission Owner’s Interconnection Facilities consist of the following constructed or installed between the POI and PCO, as well as metering and telecommunications located at the ▇▇▇▇▇ Solar Collector Substation.

  • Connecting Transmission Owner’s Attachment Facilities Connecting Transmission Owner shall design, procure, construct, install, own and/or control the Connecting Transmission Owner’s Attachment Facilities described in Appendix A hereto, at the sole expense of the Developer.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Participating TO’s Interconnection Facilities The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.