Construction Scope of Work. The construction scope of work shall include the following: Site preparation; Site development; Installation of fill and construction of embankments; Construction of the levee; Erosion and sediment control; Formation of foundations for Equipment, structures, pipe-racks and pipe tracks, and buildings, including piling and/or soils mixing where required; Installation of underground piping and drainage systems; Finished area grading and paving; Installation of structural components of the Project; Installation of the vessels, tanks, buildings, ground flares, and other Equipment; Installation of the rotating equipment, motors, turbines, compressors, pumps and blowers; Installation of piping components and systems; Installation of electrical substations and installation of power distribution Equipment; Installation of the fire water system; Installation of the power and control cabling systems; Installation of the instrument and control devices and systems; Installation of telecommunication & security equipment and systems; Installation of the instrument, control devices and systems and telecommunication & security systems cabling systems; Installation of Electrical, ICSS, Instrument, Telecom & Security Fiber Optic cabling systems; Application of paint, insulation, and fireproofing systems; Installation of permanent plant buildings, roads, security fences; Provide landscaping design and implement. The extent of landscaping and green spaces, type of vegetation used, etc. will be determined during detailed design Installation, maintenance and removal of temporary facilities; Provision of temporary facilities for the supply of electricity, water, and telephone / communication systems for construction of the works; Provision of temporary facilities for the disposal of sewage from the construction worksite up to that time that connection to the new sanitary effluent return line to local sewage treatment plant is available; and Contractor shall ensure temporary strainers or other methods of protecting Equipment are included for all Equipment that is susceptible to damage from construction debris. Contractor shall follow suppliers’ recommendations as to which Equipment this applies as a minimum requirement. Construction works include the following marine construction activities: Dredging for the MOF; Construction of the LNG carrier loading berth number 1, and the MOF (loading berth 1 will be constructed primarily using land-based equipment) and piling for loading berth 2; Installation of loading berth 1 topside Equipment; Installation of mooring & breasting dolphins; and Shoreline slope protection works in the MOF, LNG berth, and vessel turning area (as in other parts shoreline protection will have been installed prior during site preparation) Upon completion of the construction scope of work, Contractor shall remove from Site all above ground temporary facilities, except for those agreed with Owner to be retained for future stages of Facility development for which Contractor shall be suitably compensated. For underground temporary utilities see section 15.15.3.
Appears in 1 contract
Construction Scope of Work. The construction scope of work shall include the following: Site preparation; Site development; Installation of fill and construction of embankments; Construction of the levee; Erosion and sediment control; Formation of foundations for Equipment, structures, pipe-racks and pipe tracks, and buildings, including piling and/or soils mixing where required; Installation of underground piping and drainage systems; Finished area grading and paving; Installation of structural components of the Project; Installation of the vessels, tanks, buildings, ground flares, and other Equipment; Installation of the rotating equipment, motors, turbines, compressors, pumps and blowers; Installation of piping components and systems; Installation of electrical substations and installation of power distribution Equipment; Installation of the fire water systemsystem extension for Train 3; Installation of the power and control cabling systems; Installation of the instrument and control devices and systems; Installation of telecommunication & security equipment and systems; Installation of the instrument, control devices and systems and telecommunication & security systems cabling systems; Installation of Electrical, ICSS, Instrument, Telecom & Security Fiber Optic cabling systems; Application of paint, insulation, and fireproofing systems; Installation of permanent plant buildings, roads, security fences; Provide landscaping design and implement. The extent of landscaping and green spaces, type of vegetation used, etc. will be determined during detailed design Installation, maintenance and removal of temporary facilities; Provision of temporary facilities for the supply of electricity, water, and telephone / communication systems for construction of the works; Provision of temporary facilities for the disposal of sewage from the construction worksite up to that time that connection to the new sanitary effluent return line to local sewage treatment plant is available; and Contractor shall ensure temporary strainers or other methods of protecting Equipment are included for all Equipment that is susceptible to damage from construction debris. Contractor shall follow suppliers’ recommendations as to which Equipment this applies as a minimum requirement. Construction works include the following marine construction activities: Dredging for the MOF; Construction of the LNG carrier loading berth number 1, and the MOF (loading berth 1 will be constructed primarily using land-based equipment) and piling for loading berth 2; Installation of loading berth any piping, structural, civil, mechanical, electrical, instrumentation, control, or telecommunications tie-ins between Train 3 and Trains 1 topside Equipment; Installation of mooring & breasting dolphins; and Shoreline slope protection works in 2 or the MOF, LNG berth, and vessel turning area (as in other parts shoreline protection will have been installed prior during site preparation) Common Systems. Upon completion of the construction scope of work, Contractor shall remove from Site all above ground temporary facilities, except for those agreed with Owner to be retained for future stages of Facility development for which Contractor shall be suitably compensated. For underground temporary utilities see section 15.15.3.
Appears in 1 contract