Contractor Photographic and Video Documentation Sample Clauses

Contractor Photographic and Video Documentation. The Contractor is responsible for photographic and video documentation of pre-construction conditions, daily Jobsite activities, key construction activities, demonstration and training, and conditions at the time of Final Completion as detailed herewith and in Program Specifications Section 013233 (Photographic and Video Recording Documentation). The requirements, process and procedures for photographic and video documentation are to be identified in the quality control plan, and submittals to the Authority are to be provided at the specified frequencies. Photographs and video recordings by the Contractor quality control staff will be used to document installation of key construction elements, such as, but not limited to, structural steel, plumbing, electrical wiring, concrete placement, and other critical activities. Regularly scheduled quality control briefings shall be held with the Authority staff to review and identify upcoming critical items that require photographs and video recording documentation, and to review the latest quality control photographs and video recordings. The Contractor shall catalog and provide electronic files of the photographs and video recordings to the Authority at each quality control briefing, and shall provide a consolidated file of all photographs and video recordings to the COTR upon Final Completion of each Construction Work Package.

Related to Contractor Photographic and Video Documentation

  • Licensed Documentation If commercially available, Licensee shall have the option to require the Contractor to deliver, at Contractor’s expense: (i) one (1) hard copy and one (1) master electronic copy of the Documentation in a mutually agreeable format; (ii) based on hard copy instructions for access by downloading from the Internet

  • Technical Documentation Prior to commencement of the Tests on Completion, the Contractor shall supply to the Engineer the technical documentation as specified in the Employer’s Requirements. The Works or Section shall not be considered to be completed for the purposes of taking- over under sub-clause 10.1 [Taking Over of the Works and Sections] until the Engineer has received the technical documentation as defined in this sub-clause 5.7, the "history file" including design calculations and certain certification as well as any other documents required to meet the CE Marking requirements.

  • Product Documentation You should review the policy documents carefully to ensure they accurately reflect the cover, conditions, limits and other terms that you require. Particular attention should be paid to policy conditions and warranties as failure to comply with these could invalidate your policy. Claims can arise, under certain types of insurance contract, long after the expiry of the policy. It is therefore important that you retain and keep safely all documents associated with your policy.

  • Source Documentation Accounting records must be supported by such source documentation as canceled checks, bank statements, invoices, paid bills, donor letters, time and attendance records, activity reports, travel reports, contractual and consultant agreements, and subaward documentation. All supporting documentation should be clearly identified with the Award and general ledger accounts which are to be charged or credited. (i) The documentation standards for salary charges to grants are prescribed by 2 CFR 200.430, and in the cost principles applicable to the entity’s organization (Paragraphs 7.4 through 7.7). (ii) If records do not meet the standards in 2 CFR 200.430, then Grantor may notify Grantee in PART TWO, PART THREE or Exhibit G of the requirement to submit Personnel activity reports. See 2 CFR 200.430(i)(8). Personnel activity reports shall account on an after-the-fact basis for one hundred percent (100%) of the employee's actual time, separately indicating the time spent on the grant, other grants or projects, vacation or sick leave, and administrative time, if applicable. The reports must be signed by the employee, approved by the appropriate official, and coincide with a pay period. These time records should be used to record the distribution of salary costs to the appropriate accounts no less frequently than quarterly. (iii) Formal agreements with independent contractors, such as consultants, must include a description of the services to be performed, the period of performance, the fee and method of payment, an itemization of travel and other costs which are chargeable to the agreement, and the signatures of both the contractor and an appropriate official of Grantee. (iv) If third party in-kind (non-cash) contributions are used for Grant purposes, the valuation of these contributions must be supported with adequate documentation.

  • Software and Documentation Licensee may make as many copies of the Software necessary for it to use the Software as licensed. Each copy of the Software made by Licensee must contain the same copyright and other notices that appear on the original copy. Licensee will not modify the Documentation. Documentation may: (a) only be used to support Licensee’s use of the Software; (b) not be republished or redistributed to any unauthorized third party; and (c) not be distributed or used to conduct training for which Licensee, or any other party, receives a fee. Licensee will not copy any system schema reference document related to the Software.