Cooling Tower. The cooling tower will circulate 1200 gpm for a demonstrated period of 60 minutes as measured by a flow meter with all plant users in cooling mode (minimal pressure drop through system). During this same period, it will demonstrate the capacity to cool water from 95 to 87 F with an ambient WBT of 85 F at full flow. This will be determined by actual measurements and determination of capacity using standard charts.
Appears in 2 contracts
Sources: Engineering, Procurement and Construction Contract, Engineering, Procurement and Construction Contract (Quaker Chemical Corp)