Core Samples. THE LAST SENTENCE OF THE 2ND PARAGRAPH IS CHANGED TO THE FOLLOWING: Apply an even coating of tack coat to sides of the hole. Place HMA in maximum lifts of 4 inches in the hole and compact each lift. Ensure that the final surface is 1/4 inch above the surrounding pavement surface.
Appears in 4 contracts
Sources: Construction Contract, Maintenance Roadway Repair Contract, Contract for Resurfacing and Bridge Deck Repairs