Corridor Widths Clause Samples

Corridor Widths. Unless otherwise noted or required by the authority having jurisdiction, all corridors shall be at least 60” wide.

Related to Corridor Widths

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:

  • Interior The insurance covers personal property normally contained in the vehicle and belonging to the owner of the vehicle or a member of his or her household. The insurance covers loss of, and damage to, the property if the damage occurs in connection with: - a compensable fire, theft, or vehicle damage - a sudden and unforeseen external event - theft by the renter - damage in connection with a traffic accident. The insurance does not apply to: - theft-prone property - cash and valuables - property belonging to the renter. - Personal movables must be kept locked in the vehicle. If the requirements are not met, the compensation may be reduced, or the deductible increased. See section

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (▇▇▇) ▇▇▇-▇▇▇▇. The irrigation system shall be designed and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.