Corridor. The Phase Two test was performed on the SR 99 corridor between 238th Street SW and 164th Street SW. A map of this corridor is shown in Figure 6-1, with bus stops marked with cyan circles and the TPRG boxes marked with red squares. This corridor was about 5.3 miles long, with 13 signalized intersections. All the intersections were equipped with TSP for both northbound and the southbound traffic.
Appears in 2 contracts
Sources: Final Technical Report Agreement, Technical Report Agreement